Abstract:
Proposes to promote a more stable channel and restore the hydrologic function of Tumalo Creek after the change in stream dynamics following the 1979 Bridge Creek Fire. Includes restoring the channel dimension, pattern, and profile, implemented in multiple phases to restore nearly 2.8 miles of stream to reduce steam bank erosion and sedimentation , reduce the loss of wetlands, improve water quality and fish habitat, reconnect the creek to the floodplain, and restore riparian vegetation. Actions include grass seeding and tree and shrub planting, and the use of log jam and vane structures, boulder cross and J-hook vanes, side channels, and side channel pools with debris jams.
Description:
79 pp. Tables, maps, plans, appendices, illus.
Township 18 South,
Range 10 East, Sections 8, 9, and 10.
Captured May 18, 2007.