Abstract:
Proposes to replace four stream crossings in the Elk Creek fifth-field watershed by excavating the fill material from around the old culvert, removing the culvert, and replacing it with a round pipe or bottomless pipe on concrete footing. The new culvert would be placed in the stream channel and compacted fill material placed around the sides and top.
Description:
13 pp. References, map, appendices. Section 33 and 34, T.23S, R.4W; and Section 3, T.24S, R.4W; W.M. Captured July 26, 2007.