Abstract:
EA proposes to perform maintenance on the Salmon River footbridge, utilizing a partial containment system designed to contain water and solids dislodged during maintenance activities. Recommendations for treatment include: power washing the entire bridge structure, repairing areas of delamination occurring on the glu-lam support beams, repairing areas of decay and wear on the glu-lam deck surface, cleaning and painting metal hardware, treating the bulkheads and the glu-lam support structure ends, and replacing wood handrail components. FONSI finds no environmental impact statement is needed.
Description:
25 pp. Map, tables, references. Township 2 South, Range 7 East, Section 31. Captured July 7, 2008.