Carollo EngineersBend (Or.)2009-03-242009-03-242008-04http://www.ci.bend.or.us/depts/public_works/water_reclaimation_facility_plan/docs/TM_4.pdfhttps://hdl.handle.net/1794/884729 pp. Bookmarks supplied by UO. Tables, charts, figures. Published April, 2008. Captured March 24, 2009.The Bend Water Reclamation Facility (WRF) currently consists of the following liquid treatment processes: preliminary treatment; primary clarification; activated sludge using a Modified Ludzack Ettinger (MLE) process; secondary clarification; tertiary filtration (seasonal usage for production of Level IV reclaimed water); and chlorine disinfection. This Technical Memorandum (TM) summarizes the evaluation of the preliminary, primary, secondary, and tertiary processes. [From the document]City planning -- Oregon -- BendSewerage -- Oregon -- BendSewage disposal -- Oregon -- BendBend : Water reclamation facilities plan : Technical memorandum No. 4City of Bend water reclamation facilities plan technical memorandum No. 4 : Liquids process assessment draftBook