United States. Bureau of Land Management. Roseburg District Office2008-11-202008-11-202008-01https://hdl.handle.net/1794/78834 pp. Section 7, T 29 S, R 7 W. Captured January 28, 2008.Determines no environmental impact statement is needed for project proposing construction of an extension to BLM Road No. 29-7-7.0 in Section 7, T. 29 S., R. 7 W. The road extension, approximately 675 feet in length, would be temporary and unsurfaced, and located primarily on a ridge top location. Approximately 440 feet of construction would be located on BLM-managed lands, as the proposed road route crosses back and forth at three locations along the property line between BLM lands and the Delores P. Loftin Trust lands that are to be logged. This action would be authorized under an O&C Right-of-Way Permit. BLM timber cut in association with the road construction would be purchased by Swanson Group, LLC through a negotiated timber sale.en-USRight of way -- Oregon -- Roseburg RegionPublic lands -- Oregon -- Roseburg RegionForest roads -- Oregon -- Design and constructionNorth Berry Creek unilateral right-of-way and road construction permit finding of no significant impactFinding of no significant impact: North Berry Creek unilateral right-of-way and road construction permitOther