United States. Bureau of Land Management. Vale District2009-02-272009-02-272008-02-26https://hdl.handle.net/1794/86683 pp. T 34 S, R 45 E, Section 35 (SW 1/4 of SE 1/4). Captured March 10, 2008.Finds no further environmental study is needed on project replacing the North Fork Owyhee River (Fenwick Ranch Road) Bridge with a new single-span bridge to be located adjacent to the existing bridge on the downstream side. The existing bridge would remain in place during construction and would serve as a detour bridge. The new single-span bridge would span the entire river. The only in-water work would be removal of the existing bridge pier after construction of the new bridge. Malheur County has made application to the BLM for a Right-of-Way/Temporary Use Permit for the construction equipment staging area and the actual bridge project.en-USRight of way -- Oregon -- Vale RegionBridges -- Design and construction -- Environmental aspects -- Oregon -- Vale RegionPublic lands -- Oregon -- Vale Region -- ManagementFenwick Ranch Road bridge replacement finding of no significant impactFinding of no significant impact: Fenwick Ranch Road bridge replacementOther