Umpqua National Forest (Agency : U.S.)2009-03-232009-03-232009-03-16https://hdl.handle.net/1794/884313 pp. Tables. T. 30S, R. 1W, Sec. 35 and 36; T. 31S, R. 1W, Sec. 1, 2 and 11; T. 31S, R. 1E, Sec. 6 and 7. Captured March 18, 2009.Announces decision implementing roadside treatments by thinning, pruning, piling or chipping slash along the major roads (Forest Road 1610, 1610-050, 1610-100, 1610-500) within the lower Devil's Knob portion of the Elk Creek watershed. Trees and brush would be removed to bring the resulting condition to a Fuel Model 8 (an open stand with limited ground fuel) with low to moderate fuel loading resulting in healthier growing conditions for the stands. Treatment will occur alongside existing specified roads (generally 150' each side of road).en-USForest roads -- Oregon -- Umpqua National ForestFuel reduction (Wildfire prevention) -- Oregon -- Umpqua National ForestForest management -- Oregon -- Umpqua National ForestForest Road 1610 (Or.)Elk Creek Watershed (Douglas County, Or.)1610 Roadside treatment project final decision memoFinal decision memo: 1610 Roadside treatment projectOther