Guest, Elise2010-03-102010-03-102010-03-03https://hdl.handle.net/1794/10249During the 2010-11 school year, Multnomah High School (MHS) will continue to implement PRIDE with at least 80% accuracy on each sub-scale as measured by the School Evaluation Tool (SET). The SET will be conducted each December to measure and monitor school-wide implementation.During the 2010-11 school year, Multnomah High School (MHS) will continue to implement PRIDE with at least 80% accuracy on each sub-scale as measured by the School Evaluation Tool (SET). The SET will be conducted each December to measure and monitor school-wide implementation.en-USHigh schoolSecondary educationEducation, SecondaryPBSPositive behavior supportProfessional developmentSystemsSchool evaluation toolSETPRIDEMeasuring the Implementation of PRIDEPlan or blueprint