United States. Bureau of Land Management. Burns District2009-01-142009-01-142008-05https://hdl.handle.net/1794/829820 pp. Tables, references, map. The new pipeline would be within T. 41 S., R. 36 E.; It would originate in section 13, and terminate the new trough in section 1. Captured January 12, 2009.The proposed action is to create a new pipeline spur that originates at Al's Canyon Trough along Grassy Hill Pipeline, and ends at a new trough that would be placed approximately 1.5 miles due north. The new pipeline would be within T. 41 S., R. 36 E.; It would originate in section 13, and terminate the new trough in section 1. The pipeline would be buried (using a backhoe) 18 inches under an existing road, except for short lengths where rock or other underground features require an alternate route adjacent to the road. The trough would be placed approximately 1/8 mile off the road, on a broad topographic saddle. The trough would be equipped with a float valve to prevent overflow, and would include ramps to facilitate safe use by small mammals and birds.en-USWater-pipes -- Oregon -- Burns RegionPublic lands -- Oregon -- Burns RegionGrassy Hill pipeline extension environmental assessmentEnvironmental assessment: Grassy Hill pipeline extensionOther