United States. Bureau of Land Management. Roseburg District Office2008-11-072008-11-072008-01-07https://hdl.handle.net/1794/771131 pp. Tables, appendices, references, map. Section 7, T. 29 S., R. 7 W. Captured January 28, 2008.Swanson Group, LLC proposes construction of an extension to BLM Road No. 29-7-7.0 in Section 7, T. 29 S., R. 7 W. The road extension, approximately 675 feet in length, would be temporary and unsurfaced, and located primarily on a ridge top location. Approximately 440 feet of construction would be located on BLM-managed lands, as the proposed road route crosses back and forth at three locations along the property line between BLM lands and the Delores P. Loftin Trust lands that are to be logged. This action would be authorized under an O&C Right-of-Way Permit. BLM timber cut in association with the road construction would be purchased by Swanson Group, LLC through a negotiated timber sale. BLM-controlled roads to be used for timber hauling would include Road Nos. 29-7-7.0, 29-7-18.2 and 29-8-1.0.en-USForest roads -- Oregon -- Roseburg RegionRight of way -- Oregon -- Roseburg RegionPublic lands -- Oregon -- Roseburg RegionNorth Berry Creek unilateral right-of-way and road construction permit environmental assessmentEnvironmental assessment: North Berry Creek unilateral right-of-way and road construction permitOther