Metro (Or.)North Clackamas Parks & Recreation DistrictMetro (Or.). Regional Parks and Greenspaces Dept.Adolfson AssociatesJD White (Firm)2009-05-262009-05-262004-01http://www.oregonmetro.gov/files/planning/trolleytrailplan.pdfhttps://hdl.handle.net/1794/9253147 pp. Bookmarks supplied by UO. Maps, charts, tables, figures, illus., appendices. Published January, 2004. Captured January 28, 2009.The proposed Trolley Trail will run along a historic corridor once used by a streetcar line that operated between Portland and Oregon City.... acquired a 6-mile stretch of the historic rail corridor between downtown Milwaukie and Gladstone. The trail connects with existing bike lanes in Milwaukie and Gladstone and will complete an essential link in Metro's Regional Trail System. When completed, the Trolley Trail and connecting trails will create a continuous 20- mile loop connecting Portland, Milwaukie, Gladstone, Oregon City and Gresham. [From the Plan]en-USTransportation -- Oregon -- Portland Metropolitan Area -- PlanningBicycle trails -- Oregon -- Portland Metropolitan Area -- PlanningPedestrian areas -- Oregon -- Portland Metropolitan Area -- PlanningRegional planning -- Oregon -- Clackamas CountyTransportation -- Oregon -- Clackamas County -- PlanningMetro : Trolley Trail master plan (2004)Trolley Trail master plan : Milwaukie to Gladstone, OregonBook