(City of Bend (Or.), 2006-11) Bend (Or.); Bend (Or.). Dept. of Public Works
The overall goal of this Plan is to create a program that maintains the high level
of water quality historical to the area and meets the regulatory requirements of
both the Phase II NPDES stormwater program and the UIC program by minimizing stormwater pollution to the maximum extent practicable. [From the Plan]