Morrow County, Oregon Planning Documents
Permanent URI for this collection
Browse
Browsing Morrow County, Oregon Planning Documents by Author "KCM, Inc."
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item Open Access Morrow County : Transportation system plan(Morrow County (Or.), 1998-03) Morrow County (Or.); KCM, Inc.The County of Morrow has prepared this Transportation System Plan (TSP) as part of their overall Comprehensive Plan as required by Oregon Revised Statute 197.712 and the Transportation Planning Rule (TPR) OAR 660 Division 12 developed by the Department of Land Conservation and Development (DLCD). The TPR and its provisions are designed to encourage the development of a planning process that allows development of future transportation facilities, protect the operation of existing and future transportation facilities, coordinate the review of land use decisions, and promote safe and convenient pedestrian and bicycle circulation. This plan is intended to guide transportation system development for the next 20 years. The plan will be periodically updated to ensure it remains current and continues to meet the needs of the County. [From the Plan]Item Open Access Morrow County : Transportation system plan (2005)(Morrow County (Or.), 2005-07-23) Morrow County (Or.); Morrow County (Or.). Planning Dept.; CTS Engineers; Mitchell Nelson Group; KCM, Inc.The County of Morrow prepared its original Transportation System Plan (TSP) in 1997 as part of their overall Comprehensive Plan.... This TSP update (the 2005 TSP) is intended to guide transportation system development for the next 20 years. The plan will continue to be periodically updated to ensure it remains current and continues to meet the needs of the County. [From the Plan]