NEPA Documents
Permanent URI for this collection
News
The National Environmental Policy Act (Public Law 91-190) places certain requirements on projects that involve federal funding or work performed by the federal government. Documents produced as a requirement of the Act are collected here.
Browse
Browsing NEPA Documents by Subject "Boat ramps -- Oregon -- Deschutes National Forest"
Now showing 1 - 4 of 4
Results Per Page
Sort Options
Item Open Access Cultus Lake Forest Service improvements decision notice and finding of no significant impact(2003-05) Bend-Fort Rock Ranger District (Or.)Announces decision to implement Alternative 3 of project EA, removing, reconfiguring, and replacing the boat ramp and docking area, dredging to improve access to open water from the boat ramp, and redesigning the parking areas to incorporate increased and designated parking that allows for more efficient traffic flow into the launching facilities and developed campgrounds.Item Open Access Cultus Lake Forest Service improvements environmental assessment(2003-02) Bend-Fort Rock Ranger District (Or.)Proposes to remove, reconfigure, and replace the boat ramp and docking area, dredge to improve access to open water from the boat ramp, and redesign the parking areas to incorporate increased and designated parking that allows for more efficient traffic flow into the launching facilities and a developed campground.Item Open Access Gull Point boat ramps improvement project decision notice and finding of no significant impact(2008-02-28) Bend-Fort Rock Ranger District (Or.)Announces decision to authorize implementation of Alternative 2 of project EA, bettering recreational infrastructure, public safety and satisfaction by improving the boat ramps at Gull Point and North Wickiup. Includes replacing existing ramp to provide safe boat launching facilities for boaters during a wide range of reservoir elevations and putting boarding floats on the new ramp at Gull Point, and providing additional parking for ramps and replacing them with those designed to provide safe boat launching facilities during a wide range of reservoir elevations at North Wickiup.Item Open Access Gull Point boat ramps improvement project environmental assessment(2007-11) Bend-Fort Rock Ranger District (Or.)Proposes to better recreation infrastructure, public safety and satisfaction by improving the boat ramps at Gull Point and North Wickiup. Includes replacing existing ramp to provide safe boat launching facilities for boaters during a wide range of reservoir elevations and putting boarding floats on the new ramp at Gull Point, and providing additional parking and replacing existing ramps with one designed to provide safe boat launching facilities during a wide range of reservoir elevations at North Wickiup.