North South OHV trail project decision memo
Loading...
Date
2009-03-02
Authors
Umatilla National Forest (Agency : U.S.)
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Announces decision initiating project developing a designated OHV trail by using existing roads, existing areas of past disturbance (skid trails, temporary logging roads, and firelines), and minimal new trail construction (5.5 miles) along road corridors of FRs 40, 43, and 44. This trail will move ATV and motorcycle traffic from approximately 12.7 miles of motorized mixed-use traffic on FR 40 to approximately 11.9 miles of newly designated ATV trail that parallels the road. The entire trail will be approximately 30 miles long and will provide ATV access from Stevens Ridge to Big Butte. It will be designed and designated for use by ATVs and motorcycles.
Description
10 pp. Tables. The planning area includes portions of T9N, R42E, Sections 16, 17, 19, 20, 29, and 32; T8N, R42E, Sections 5, 8, 9, 14-16, 22, 23, 25, 26, and 36; T8N, R43 E, Sections 28, 29, 31-36; T8N, R44E, Section 32; and T7N, R44E, Section 2-6 and 10. Captured March 16, 2009.
Keywords
Off-road vehicles -- Umatilla National Forest (Or. and Wash.), Forest management -- Umatilla National Forest (Or. and Wash.), Trails -- Umatilla National Forest (Or. and Wash.)