Huckleberry Flats OHV Trail Expansion Environmental Assessment

Loading...
Thumbnail Image

Date

2007-04

Authors

Willamette National Forest (Agency : U.S.)

Journal Title

Journal ISSN

Volume Title

Publisher

Eugene, Or. : Willamette National Forest, 2007

Abstract

Proposes to increase the existing OHV Trail system by approximately 30 miles, to 63 miles, including a trail segment that will provide an alternative route to a mixed-use road where higher vehicle speeds may occur as well as other connecting segments. A Nonsignificant Forest Plan Amendment is included in the Proposed Action, which would 1) change the designation of the Huckleberry BGEA (Big Game Emphasis Area) from Medium Emphasis to Low Emphasis and 2) change the designation of the adjoining South Christy BGEA from Medium Emphasis to High Emphasis to increase the quality of habitat management there to compensate for the reduction within the Huckleberry area.

Description

106 p. Maps, tables, references, appendices. T19S, R4E Sections 31-34; T20S, R3E Sections 1, 12, 25; T20S, R4E Sections 4-10, 15-21, 30

Keywords

Forest management -- Oregon -- Willamette National Forest, Off-road vehicles -- Oregon -- Willamette National Forest, Trails -- Oregon -- Willamette National Forest

Citation