Fenwick Ranch Road bridge replacement finding of no significant impact

dc.contributor.authorUnited States. Bureau of Land Management. Vale District
dc.date.accessioned2009-02-27T22:49:54Z
dc.date.available2009-02-27T22:49:54Z
dc.date.issued2008-02-26
dc.description3 pp. T 34 S, R 45 E, Section 35 (SW 1/4 of SE 1/4). Captured March 10, 2008.en
dc.description.abstractFinds no further environmental study is needed on project replacing the North Fork Owyhee River (Fenwick Ranch Road) Bridge with a new single-span bridge to be located adjacent to the existing bridge on the downstream side. The existing bridge would remain in place during construction and would serve as a detour bridge. The new single-span bridge would span the entire river. The only in-water work would be removal of the existing bridge pier after construction of the new bridge. Malheur County has made application to the BLM for a Right-of-Way/Temporary Use Permit for the construction equipment staging area and the actual bridge project.en
dc.identifier.urihttps://hdl.handle.net/1794/8668
dc.language.isoen_USen
dc.relation.ispartofseriesNEPA;
dc.subjectRight of way -- Oregon -- Vale Regionen
dc.subjectBridges -- Design and construction -- Environmental aspects -- Oregon -- Vale Regionen
dc.subjectPublic lands -- Oregon -- Vale Region -- Managementen
dc.titleFenwick Ranch Road bridge replacement finding of no significant impacten
dc.title.alternativeFinding of no significant impact: Fenwick Ranch Road bridge replacementen
dc.typeOtheren

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Fenwick_Bridge_Replacement_Project_FONSI.pdf
Size:
25.92 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
1.79 KB
Format:
Item-specific license agreed upon to submission
Description: