Whittaker Creek Recreation Site waste water pipe extension decision record/categorical exclusion review

dc.contributor.authorUnited States. Bureau of Land Management. Eugene District
dc.date.accessioned2008-09-22T19:08:32Z
dc.date.available2008-09-22T19:08:32Z
dc.date.issued2005-10-04
dc.description3 pp. This site is located approximately 40 miles west of Eugene, Oregon, in Township 18 South, Range 8 West, Section 21. Captured July 13, 2007.en
dc.description.abstractProposes to upgrade the drinking water drainage system to the only operating hand pump within the recreation site. Project would bring the pump into compliance by replacing the existing 20-foot drain pipe with the required 100-foot pipe, ending west of campsite 4. Work would include digging a ditch for the new pipe with a ditch digger within a bushy area while the camp is closed.en
dc.format.extent106493 bytes
dc.format.mimetypeapplication/pdf
dc.identifier.urihttps://hdl.handle.net/1794/7346
dc.language.isoen_USen
dc.relation.ispartofseriesNEPAen
dc.subjectPublic lands -- Oregon -- Eugene Region -- Managementen
dc.subjectPublic lands -- Recreational use -- Oregon -- Eugene Regionen
dc.subjectDrainage pipesen
dc.subjectWhittaker Creek Recreation Site (Or.)en
dc.titleWhittaker Creek Recreation Site waste water pipe extension decision record/categorical exclusion reviewen
dc.title.alternativeDecision record/categorical exclusion review: Whittaker Creek Recreation Site waste water pipe extensionen
dc.typeOtheren

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Whittaker_Creek_Recreation_Site_Waste_Water_Pipe_Extension.pdf
Size:
104 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
2.21 KB
Format:
Item-specific license agreed upon to submission
Description: