Engineering road improvement and realignment decision document
Loading...
Date
2007-06-11
Authors
United States. Bureau of Land Management. Roseburg District Office
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Announces decision to authorize the implementation of the Proposed Action Alternative as described in the Engineering Improvement and Realignment Environmental Assessment. The Engineering Improvement and Realignment will occur on two Bureau of Land Management roads; the Hubbard Creek Road (26-7-19.1) and the Long Ranch Road (26-3-20.3) located in Upper Umpqua Fifth-Field Watershed. Within Hubbard Creek and Camp Creek drainages the BLM proposes to repair and/or improve 1.3 miles of the existing Hubbard Creek Road (26-7-19.1) and 0.4 miles of the existing Long Ranch Road (26-7-20.3).
Description
10 pp. Sections 19 and 21; T26S, R07W; W.M. Captured July 24, 2007.
Keywords
Logging -- Oregon -- Roseburg Region, Forest roads -- Oregon -- Maintenance and repair, Public lands -- Oregon -- Roseburg Region