Big Marsh Creek 6020 Road crossing replacement environmental assessment

Loading...
Thumbnail Image

Date

2002-09

Authors

Crescent Ranger District (Or.)

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from Forest land, dewatering of footing sites, bolting the culvert together and backfilling to create the new crossing, which would be paved.

Description

15 pp. Table, map. T25S, R7E. Captured May 23, 2007.

Keywords

Forest management -- Oregon -- Deschutes National Forest, Culverts -- Oregon -- Deschutes National Forest

Citation