Big Marsh Creek 6020 Road crossing replacement environmental assessment
Loading...
Date
2002-09
Authors
Crescent Ranger District (Or.)
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from Forest land, dewatering of footing sites, bolting the culvert together and backfilling to create the new crossing, which would be paved.
Description
15 pp. Table, map.
T25S, R7E.
Captured May 23, 2007.