Sled Springs OHV trail system and road management plan environmental assessment
Loading...
Date
2008-11
Authors
Wallowa-Whitman National Forest (Agency : U.S.)
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Proposes to establish a 166-mile OHV trail system in the Sled Springs area. This OHV trail system
would be for all-terrain vehicles and motorcycles. The proposal consists of converting 71
miles of existing roads into OHV-only trails, converting an additional 77 miles of existing
roads into routes available for both full-sized vehicles and OHVs, and constructing
approximately 18 miles of new OHV trail as connections between existing roads to create
logical riding loops. This alternative also includes the placement of five OHV bridges where trails cross
streams.
Description
175 pp. Tables, maps, appendices, references. T3 and T4 N, R 43 and R44 E. Captured March 23, 2009.
Keywords
Trails -- Oregon -- Wallowa-Whitman National Forest, Off-road vehicles -- Oregon -- Wallowa-Whitman National Forest, Forest management -- Oregon -- Wallowa-Whitman National Forest