Sled Springs OHV trail system and road management plan environmental assessment

Loading...
Thumbnail Image

Date

2008-11

Authors

Wallowa-Whitman National Forest (Agency : U.S.)

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

Proposes to establish a 166-mile OHV trail system in the Sled Springs area. This OHV trail system would be for all-terrain vehicles and motorcycles. The proposal consists of converting 71 miles of existing roads into OHV-only trails, converting an additional 77 miles of existing roads into routes available for both full-sized vehicles and OHVs, and constructing approximately 18 miles of new OHV trail as connections between existing roads to create logical riding loops. This alternative also includes the placement of five OHV bridges where trails cross streams.

Description

175 pp. Tables, maps, appendices, references. T3 and T4 N, R 43 and R44 E. Captured March 23, 2009.

Keywords

Trails -- Oregon -- Wallowa-Whitman National Forest, Off-road vehicles -- Oregon -- Wallowa-Whitman National Forest, Forest management -- Oregon -- Wallowa-Whitman National Forest

Citation