Fenwick Ranch Road bridge replacement environmental assessment
Datum
2007-12
Zeitschriftentitel
ISSN der Zeitschrift
Bandtitel
Verlag
Zusammenfassung
The Proposed Action is replacement of the North Fork Owyhee River (Fenwick
Ranch Road) Bridge with a new single-span bridge to be located adjacent to the
existing bridge on the downstream side. The existing bridge would remain in place during construction and would serve
as a detour bridge. The new single-span bridge would span the entire river. The
only in-water work would be removal of the existing bridge pier after construction
of the new bridge. Malheur County has made application to the BLM for
a Right-of-Way/Temporary Use Permit for the construction equipment staging area and
the actual bridge project.
Beschreibung
71 pp. References, appendices, maps, figures. T 34 S, R 45 E, Section 35 (SW 1/4 of SE 1/4). Captured March 10, 2008.
Schlagwörter
Right of way -- Oregon -- Vale Region, Bridges -- Design and construction -- Environmental aspects -- Oregon -- Vale Region, Public lands -- Oregon -- Vale Region -- Management