Fenwick Ranch Road bridge replacement environmental assessment

Loading...
Thumbnail Image

Date

2007-12

Authors

United States. Bureau of Land Management. Vale District

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

The Proposed Action is replacement of the North Fork Owyhee River (Fenwick Ranch Road) Bridge with a new single-span bridge to be located adjacent to the existing bridge on the downstream side. The existing bridge would remain in place during construction and would serve as a detour bridge. The new single-span bridge would span the entire river. The only in-water work would be removal of the existing bridge pier after construction of the new bridge. Malheur County has made application to the BLM for a Right-of-Way/Temporary Use Permit for the construction equipment staging area and the actual bridge project.

Description

71 pp. References, appendices, maps, figures. T 34 S, R 45 E, Section 35 (SW 1/4 of SE 1/4). Captured March 10, 2008.

Keywords

Right of way -- Oregon -- Vale Region, Bridges -- Design and construction -- Environmental aspects -- Oregon -- Vale Region, Public lands -- Oregon -- Vale Region -- Management

Citation