Fenwick Ranch Road bridge replacement environmental assessment
Loading...
Date
2007-12
Authors
United States. Bureau of Land Management. Vale District
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The Proposed Action is replacement of the North Fork Owyhee River (Fenwick
Ranch Road) Bridge with a new single-span bridge to be located adjacent to the
existing bridge on the downstream side. The existing bridge would remain in place during construction and would serve
as a detour bridge. The new single-span bridge would span the entire river. The
only in-water work would be removal of the existing bridge pier after construction
of the new bridge. Malheur County has made application to the BLM for
a Right-of-Way/Temporary Use Permit for the construction equipment staging area and
the actual bridge project.
Description
71 pp. References, appendices, maps, figures. T 34 S, R 45 E, Section 35 (SW 1/4 of SE 1/4). Captured March 10, 2008.
Keywords
Right of way -- Oregon -- Vale Region, Bridges -- Design and construction -- Environmental aspects -- Oregon -- Vale Region, Public lands -- Oregon -- Vale Region -- Management