Fenwick Ranch Road bridge replacement environmental assessment

Datum

2007-12

Zeitschriftentitel

ISSN der Zeitschrift

Bandtitel

Verlag

Zusammenfassung

The Proposed Action is replacement of the North Fork Owyhee River (Fenwick Ranch Road) Bridge with a new single-span bridge to be located adjacent to the existing bridge on the downstream side. The existing bridge would remain in place during construction and would serve as a detour bridge. The new single-span bridge would span the entire river. The only in-water work would be removal of the existing bridge pier after construction of the new bridge. Malheur County has made application to the BLM for a Right-of-Way/Temporary Use Permit for the construction equipment staging area and the actual bridge project.

Beschreibung

71 pp. References, appendices, maps, figures. T 34 S, R 45 E, Section 35 (SW 1/4 of SE 1/4). Captured March 10, 2008.

Schlagwörter

Right of way -- Oregon -- Vale Region, Bridges -- Design and construction -- Environmental aspects -- Oregon -- Vale Region, Public lands -- Oregon -- Vale Region -- Management

Zitierform