Browsing by Title

Navigation

Display Options

Results

  • Wallowa-Whitman National Forest (Agency : U.S.) (2004)
    Analyzes the watershed and its twelve subwatersheds to facilitate planing, implementation, and evaluation of forest management activities. Identifies existing conditions and provides an analytical framework and integration ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2004)
    Analyzes the watershed and its twelve subwatersheds to facilitate planing, implementation, and evaluation of forest management activities. Identifies existing conditions and provides an analytical framework and integration ...
  • United States. Bureau of Land Management. Lakeview District (2008-03-10)
    Categorically excludes action of application by the Oregon Rafting Team for a Special Recreation Permit to hold a whitewater downriver rafting race on the Upper Klamath River.
  • United States. Bureau of Land Management. Eugene District (2005-01)
    Proposed preferred plan would emphasize development of rustic recreation facilities at Hult Reservoir and development of a non-motorized trail system in the SRMA. Facilities would include: an improved boat launch for ...
  • Spitzley, Katherine (University of Oregon, 2024-01-09)
    In recent years, virtual reality (VR) systems have experienced significant technological advancements, resulting in increased accessibility and improved product quality. Early VR systems were limited by low visual quality, ...
  • Crescent Ranger District (Or.) (2002-12)
    Analyzes road conditions on the 80,375 acres of the watershed, in an area of unevenly distributed roads. Six-part process consists of: setting up the analysis, describing the situation, identifying the issues, assessing ...
  • McKenzie River Ranger District (Or.) (2007-06-14)
    Announces decision to implement Alternative 2 of the project EA, providing and maintaining opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and ...
  • McKenzie River Ranger District (Or.) (2007-02)
    Proposes to provide and maintain opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and reconstructing the existing launch at Paradise. Includes ...
  • McKenzie River Ranger District (Or.) (2004-02)
    Proposes supplementation of existing woody material to act as flow deflection and capture spawning gravels in the McKenzie River channel upstream of Trail Bridge Dam. Existing material would be supplemented with trees ...
  • Willamette National Forest (Agency : U.S.) (2007-03)
    Proposes to close and store approximately 24 miles of roads in the watershed to minimize adverse affects to the resources and improve ability to perform adequate road maintenance activities within the existing budgetary ...
  • United States. Bureau of Land Management. Burns District (2007-10)
    The proposed action is to place a headbox in the spring that fills UNNSR (approximately 0.2-acre) so water can be piped to a new 1,200-gallon trough. The trough would be installed 500 feet northwest of the reservoir. ...
  • United States. Bureau of Land Management. Burns District (2007-10-17)
    The proposed action is to place a headbox in the spring that fills UNNSR (approximately 0.2-acre) so water can be piped to a new 1,200-gallon trough. The trough would be installed 500 feet northwest of the reservoir. ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2005)
    Unfinished draft analyzes the watershed and its thirteen subwatersheds to facilitate planning, implementation, and evaluation of forest management activities. Examines issues, including vegetation and forest health, riparian ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2005)
    Unfinished draft analyzes the watershed and its thirteen subwatersheds to facilitate planning, implementation, and evaluation of forest management activities. Examines issues, including vegetation and forest health, riparian ...
  • [Government Agency(s)] ()
  • United States. Bureau of Land Management. Eugene District (2008-12-10)
    Actions analyzed in this EA include density management and commercial thinning, riparian enhancement treatments, botanical restoration treatments, culvert replacements/removals, and road construction, renovation, ...
  • United States. Bureau of Land Management. Lakeview District (2007-11-02)
    Announces decision implementing proposed action of EA for the Buck 15 area of the project, specifically harvesting 2.9 million board feet from 467 acres in sections 14 and 15 of Township 38 South, Range 5 East. Entire ...
  • United States. Bureau of Land Management. Lakeview District (2003-07-02)
    Announces decision implementing Alternative 1 of project EA covering the Surveyor timber sale, located on a portion of the project which enacts commercial timber harvesting, road restoration work, riparian habitat restoration, ...
  • United States. Bureau of Land Management. Lakeview District (2003-11-19)
    Announces decision implementing the watershed restoration treatments of the EA. Includes removal of three stream crossings, placement of large woody debris into about .25 miles of an ephemeral/intermittent stream channel, ...
  • United States. Bureau of Land Management. Lakeview District (2003-04-01)
    Proposes commercial timber harvesting, road restoration work, riparian habitat restoration, District Designated Reserve treatments, fuels treatments, stream enhancement work, and aspen stand enhancement. Includes use of ...

Search Scholars' Bank

Browse

My Account

Statistics