Browsing by Author "W&H Pacific"

Navigation

Display Options

Results

  • Adrian (Or.); W&H Pacific; TriLand Design Group (City of Adrian (Or.), 2001-06-07)
    The plan was developed through a series of technical analyses combined with input from County and ODOT staff. Key elements of the process included: involving the City of Adrian (Chapter 1); reviewing Existing Plans and ...
  • Ashland (Or.); W&H Pacific (City of Ashland (Or.), 1998-04)
    The City of Ashland has committed to developing a well planned, comprehensive transportation system that balances the needs of future land development with a system that serves all users. In the development of the TSP, the ...
  • Clackamas County (Or.); W&H Pacific; DKS Associates; Hobson Johnson; Pacific Rim Resources, Inc.; Oregon. Dept. of Transportation (Clackamas County (Or.), 1999-06)
    This final report presents the Preferred Alternative as developed by the Project Management Team (PMT). The Preferred Alternative includes two main sections: The Street Design and Circulation Plan - includes recommended ...
  • Klamath County (Or.); Klamath Falls (Or.); Kittelson & Associates; W&H Pacific (Klamath County (Or.), 1998-10-12)
    The Oregon Department of Transportation (ODOT), Klamath County, Basin Transit and the City of Klamath Falls have undertaken a study of the Klamath Falls urban area, culminating in the Klamath Falls Urban Area Transportation ...
  • Malheur County (Or.); W&H Pacific (Malheur County (Or.), 1998-03)
    The Malheur County Transportation System Plan (TSP) guides the management of existing and future transportation facilities for the next 20 years. This TSP document will replace the existing Transportation chapter of the ...
  • Port of Coos Bay (Or.); Benkendorf Associates; Landrum & Brown; Coffman Associates; W&H Pacific; Richard Turi Architecture & Planning (Port of Coos Bay (Or.), 2002-11)
    The master plan consists of eight different chapters, as follows: executive summary; inventory; forecasts; facility requirements; airport alternatives; terminal siting/alternatives; financial plan; airport plans. ...
  • Port of Portland (Or.); Coffman Associates; W&H Pacific; Jeanne Lawson Associates; Angelo Eaton & Associates; Greenfield, Mark J.; Natural Resource Planning Services, Inc. (Port of Portland (Or.), 2005-05)
    The Hillsboro Airport Master Plan study was undertaken to evaluate the airport's capabilities and role, to forecast future aviation demand, and to plan for the timely development of new or expanded facilities that may ...
  • Port of Portland (Or.); W&H Pacific (Port of Portland (Or.), 2008-04)
    The Port and the Federal Aviation Administration (FAA) initiated a Master Plan Update project in 2006. An Airport Master Plan is a 20-year guide that outlines how the physical development of an airport can satisfy ...
  • Rainier (Or.); Kittelson & Associates; W&H Pacific (City of Rainier (Or.), 1997-09)
    A comprehensive analysis of the transportation system in the Rainier area has been prepared in conjunction with the Oregon Department of Transportation, the City of Rainier, the Rainier Transportation Plan Advisory ...
  • Scappoose (Or.); W&H Pacific; Coffman Associates (City of Scappoose (Or.), 2004-09)
    By establishing a thorough and accurate inventory, an appropriate forecast, financial plan airfield and landside development can be determined.... In this report, forecasts of based aircraft, based aircraft fleet mix, and ...
  • Sweet Home (Or.); W&H Pacific; Kittelson & Associates; SRI/Shapiro, Inc. (City of Sweet Home (Or.), 2003-06-20)
    The City of Sweet Home has committed to developing a well planned comprehensive transportation system that balances the needs of future land development with a system that serves all users. In the development of a ...
  • Toledo (Or.); W&H Pacific (City of Toledo (Or.), 1995-06)
    The City of Toledo, in conjunction with Lincoln County and the Oregon Department of Transportation (ODOT) initiated a study of the area transportation system in November 1994. This study was conducted in compliance with ...
  • Vale (Or.); W&H Pacific; TriLand Design Group (City of Vale (Or.), 1998-02)
    The City of Vale Transportation System Plan (TSP) guides the management of existing and future transportation facilities for the next 20 years. This TSP document satisfies the requirements of the Oregon Transportation ...

Search Scholars' Bank

Browse

My Account

Statistics