2024-03-28T23:23:40ZEmpire Stone decorative stone project draft decision memo
https://scholarsbank.uoregon.edu/xmlui/handle/1794/7136
Empire Stone decorative stone project draft decision memo
Bend-Fort Rock Ranger District (Or.)
Announces decision to be made will be to issue a special use permit for prospecting to Empire Stone Company to explore for decorative stone material. Includes digging up to 10 holes approximately 5'x 5' in size in preselected locations to determine the depth and range of the desired material, which will be hand-drilled to test for quality, and a backhoe or excavator and pickup truck will haul the drill equipment and generator to power the drill.
7 pp.
Township 18 South, Range 12 East,
Section 6.
Captured May 17, 2007.
2005-12-01T00:00:00ZUser created road closures decision memo
https://scholarsbank.uoregon.edu/xmlui/handle/1794/7135
User created road closures decision memo
Bend-Fort Rock Ranger District (Or.)
Announces decision to categorically exclude project closing 5 user created roads adjacent to Newberry National Volcanic Monument. The approximately 1/4 mile of road, which leads to user created dispersed campsites along Paulina Creek, are contributing to resource damage through erosion, trampling, and soil displacement, and the dispersed campsites will be modified by shrinking them and using barriers to protect riparian areas.
6 pp.
Township 21 South, Range
11 East, Section 28 (4 roads)
Township 21 South, Range
12 East, Section 32 (1 road).
Captured July 25, 2008.
2003-05-01T00:00:00ZNordic trail reconstruction decision memo
https://scholarsbank.uoregon.edu/xmlui/handle/1794/7134
Nordic trail reconstruction decision memo
Bend-Fort Rock Ranger District (Or.)
Announces decision to categorically exclude project reconstructing approximately 9 miles and relocating .75 miles of Nordic ski trails located in or adjacent to Newberry National Volcanic Monument. Includes using chainsaw and hand tools to remove bushy undergrowth and blow downs, prune limbs, fell dead trees that could fall into the trail, fix drainage problems, and resign the trails with reassurance markers and directional signing.
6 pp.
Township 21 South, Range 12 East, Section
32.
Captured July 25, 2008.
2003-05-01T00:00:00ZSeventh Mountain rock pit expansion environmental assessment
https://scholarsbank.uoregon.edu/xmlui/handle/1794/7000
Seventh Mountain rock pit expansion environmental assessment
Bend-Fort Rock Ranger District (Or.)
Proposes to expand the Pit to access sand, gravel and aggregate material for use on the Forest for about the next 20 years. Includes using dozers with push blades, loaders and rock crushers, clearing trees from about 7 acres, removing 2-3 feet of topsoil excavating underlying material to a depth of 4-8 feet below the current high point for use.
11 pp. Map.
Township 18 S, Range 11 E, NW 1/4 of the NE 1/4 and NE
1/4 of the NW 1/4 Section 28.
Captured June 27, 2007.
2000-07-10T00:00:00Z