Browsing Park and recreation plans by Title

Navigation

Display Options

Results

  • Walker-Macy; Madras (Or.) (City of Madras (Or.), 2004-11)
    This master plan for Madras Parks and Open Space, the first for this community, serves to inventory current local resources and conditions, identify specific issues important to the City and its residents and present an ...
  • Medford (Or.); Project A Inc. (City of Medford (Or.), 2003)
    [T]his plan will address community needs and provide new direction for the development of parks and leisure services for the next twenty-five years. The City has an excellent foundation for a thriving park system and ...
  • Medford (Or.); Design Studios West; Medford Urban Renewal Agency (City of Medford (Or.), 2003-01-21)
    In February 2002, Design Studios West, Inc (DSW) was engaged, by the City of Medford and the Medford Urban Renewal Agency (MURA), to prepare a master plan for the seven and one-half mile length of the Bear Creek Corridor ...
  • Molalla (Or.); Alta Planning and Design; Cogan Owens Cogan (Firm) (City of Molalla (Or.), 2007-07-27)
    This plan is a guide for future decisions and activities concerning how the City of Molalla will acquire, develop, operate and maintain land, facilities and programs related to parks, recreation and trails over a 20-year ...
  • University of Oregon. Dept. of Planning, Public Policy and Management. Community Planning Workshop; Monmouth (Or.) (City of Monmouth (Or.), 2008-12-02)
    The Monmouth Parks Master Plan is intended to guide development of the municipal parks system for the period between 2008 and 2028. This Plan is an update to the 1998 Monmouth Parks Master Plan. A parks master plan ...
  • University of Oregon. Dept. of Planning, Public Policy and Management. Community Planning Workshop; Enriori, Nico; Fukahori, Sayaka; Kraemer, Nick; Scotten, Heather; Wallace, John; Zanetto, Laura; Doherty, Amy; Baker, Peter; McArthur, Colin; Parker, Bob (City of Monmouth (Or.), 2008-12-02)
  • Mosier (Or.); Quatrefoil, Inc.; Bramare, Inc.; Crane and Merseth Engineering and Surveying; Walker, Diloreto, Younie (City of Mosier (Or.), 2002-08-25)
    Plans will be developed based on the priorities developed by the citizens stakeholders committee. The current priorities are the Rock Creek trail head and restoration of the Rock Creek riparian area, Columbia River access ...
  • University of Oregon. Dept. of Planning, Public Policy and Management. Community Planning Workshop; Fukahori, Sayaka; Neff, Ray; Tomlinson, Titus; Zanetto, Laura; Kraemer, Nick; Scotten, Heather; Johnson, Bethany (City of Mt. Angel (Or.), 2009-05)
  • Oakridge (Or.); Westfir (Or.); Oakridge-Westfir Area Chamber of Commerce (Or.); United States. National Park Service. Rivers, Trails, and Conservation Assistance Program; Oakridge-Westfir Community Trails Committee (City of Oakridge (Or.), 2007-04)
    of- town and Forest Trails. The purpose of these distinctions is to provide some guidance as to how different types of trails would be developed. The trails would be interconnected allowing a practical and efficient route ...
  • Oregon City (Or.); GreenPlay (Firm); Design Concepts (Firm); Geowest (Firm); ETC/Leisure Vision (Firm) (City of Oregon City (Or.), 2007-08)
    The Oregon City Parks and Recreation Master Plan Update is intended to help meet the needs of current and future residents by positioning Oregon City to build on the community’s unique parks and recreation assets and ...
  • Portland (Or.); Portland Parks and Recreation; Hillsdale Neighborhood Association (Portland, Or.) (City of Portland (Or.), 2005-06)
    This Functional Plan is designed to provide basic direction to neighbors, citizens and parks staff in the appropriate use of, and protection for, Stephens Creek Nature Park. A park functional plan consists of a vision ...
  • Portland (Or.); Portland Development Commission; Portland (Or.). Bureau of Planning; Portland (Or.). Bureau of Environmental Services; Portland Parks and Recreation; Portland (Or.). Bureau of Transportation; KPFF Consulting Engineers; Portland (Or.). Bureau of Development Services; SERA Architects (Portland Development Commission, 2006-04)
    The Portland Development Commission (PDC) and the Bureau of Planning are working with stakeholders to create a framework plan for the Centennial Mills site, which will summarize public’s goals for the site. The framework ...
  • Portland (Or.); Portland Parks and Recreation (City of Portland (Or.), 2004-03)
    The Management Plan provides an outline of policies and development concepts for the Children’s Arboretum site. The plan outlines a long-term vision for the park and is intended as a guide to prepare construction drawings, ...
  • Portland (Or.); Portland Parks and Recreation; Portland (Or.). Bureau of Planning; Portland Development Commission (City of Portland (Or.), 1993-07-02)
    The Columbia South Shore Slough Trail Master Plan is a comprehensive plan for that part of Columbia Shough trail section that lies in the Columbia South Shore Plan District. The slough trail is part of the larger 40 Mile ...
  • Portland (Or.); Portland Parks and Recreation; Portland Development Commission (Portland Development Commission, 2004)
    In 2003 the Interstate Corridor Urban Renewal Area (ICURA) Parks Subcommittee completed a Needs Assessment for the parks and open spaces of the Interstate Corridor Urban Renewal Area. This document serves as a reference ...
  • Portland Development Commission; Portland (Or.); Portland Parks and Recreation (Portland Development Commission, 2004)
    The assessment and recommended improvements proposed for Denorval Unthank Park will fulfill the ICURA accepted goals and strategies by enhancing an existing park and creating a better environment within the Boise Neighborhood ...
  • Portland (Or.); Portland Parks and Recreation; Portland (Or.). Bureau of Environmental Services (City of Portland (Or.), 2005-11)
    The Master Plan for Errol Heights Park outlines a long-term vision for the park and includes policies and development concepts. The plan also is intended to guide the preparation of detailed design and construction drawings, ...
  • Portland (Or.); Portland Parks and Recreation (City of Portland (Or.), 2006-10)
    PP&R currently operates parks maintenance functions in many locations throughout the city. The primary maintenance delivery system is comprised of the Central Facility, five (5) Service Zones, City Nature North and City ...
  • Portland (Or.); Portland Parks and Recreation (City of Portland (Or.), 2006-07)
    A Level 1 Master Plan is designed to produce a site plan and conceptual development plan for parks that are typically 5 acres or less and that do not have complex issues or concerns. The master plan considers the whole ...
  • Portland (Or.); Portland Development Commission; Portland Parks and Recreation (Portland Development Commission, 2003-07-14)
    Each year the CAC [Citizen Advisory Committee]will make recommendations to PDC about allocating urban renewal funds for parks. The Needs Assessment provides background and direction for those choices. It provides a flexible ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics