Browsing Transportation plans by Title

Navigation

Display Options

Results

  • Aurora (Or.); Oregon Downtown Development Association; Hilliard, Vicki D.; Henry, Heidi E.; Dortignacq, Robert; Huntington, Wallace (City of Aurora (Or.), 2000-04)
    The design team [for this Plan] worked with designated representatives of ODDA and Aurora. Work was based, in part, upon comments from prior studies including; Vision Aurora (1995), City of Aurora Transportation Plan (1999), ...
  • Aurora (Or.) (City of Aurora (Or.), 2002-01-08)
    This transportation system plan (TSP) addresses the anticipated transportation needs for the year 2018. The TSP is being prepared to address federal and state regulations that require urban areas to do longrange planning. ...
  • David Evans and Associates; Greenfield, Mark J.; Cogan Owens Cogan (Firm); Baker City (Or.); Baker County (Or.) (City of Baker City (Or.), 2005-06-14)
    The I-84 Baker Interchange Area Management Plan (IAMP) for the interchange areas surrounding Interstate 84 Interchanges 302 and 306 describe existing traffic and land use patterns in the interchange areas, identify potential ...
  • Baker City (Or.); David Evans and Associates (City of Baker City (Or.), 1996-08-29)
    The Baker City Transportation System Plan guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Bandon (Or.); Coos County (Or.); Oregon. Dept. of Transportation (Oregon Dept. of Transportation, 2004-08-17)
    The Oregon Department of Transportation (ODOT) developed this Access Management Plan (AMP) in compliance with the Oregon Highway Plan (OHP) and in response to a South West Area Commission on Transportation (SWACT) directive ...
  • Bandon (Or.); Bandon (Or.). Planning Dept.; JRH Transportation Engineering; Oregon. Dept. of Transportation (City of Bandon (Or.), 2000-10)
    The TSP will establish a system of transportation facilities and services adequate to meet the City of Bandon's identified transportation needs for the next twenty years. It will be consistent with the County TSP and ...
  • Bay City (Or.); CH2M Hill, inc.; Angelo Eaton & Associates; Alta Planning and Design; Oregon. Dept. of Transportation (City of Bay City (Or.), 2003-06)
    The Bay City Downtown Transportation Plan addresses key transportation issues in the downtown area. These include street design (including cross sections, traffic circulation, onstreet parking, pedestrian and bicycle ...
  • DKS Associates; Beaverton (Or.) (City of Beverton (Or.), 2009-01)
    This document presents the assumptions and methodology used to project future traffic growth and identifies locations that will require additional improvements to meet the future needs of various modes of travel. [From ...
  • Beaverton (Or.); DKS Associates (City of Beaverton (Or.), 1999-10-14)
    The transportation system was broken into five basic modes (or mode groups: Pedestrians; Bicycles; Transit; Motor Vehicles; Other Modes (Including Rail, Air, Water, Pipeline, etc.). The TSP planning objective was to ...
  • Beaverton (Or.); DKS Associates (City of Beaverton (Or.), 2001-09-29)
    The State Transportation Planning Rule calls for local agencies to adopt their TSP within 12 months of the completion of a Regional Transportation Plan. To meet this requirement, this Transportation System Plan Update has ...
  • Bend Metro Park and Recreation District; Bend (Or.); J.T. Atkins & Company; Bend Park and Recreation Foundation (City of Bend (Or.), 2002-09)
    The Deschutes River Trail Action Plan (Action Plan) builds on the information developed during the Bend Riverway planning process and provides an additional level of detail for a range of projects. The information presented ...
  • Bend (Or.) (City of Bend (Or.), 2006-06-21)
    The TSP provides city of Bend compliance with the requirements set out in Oregon Administrative Rule: 660-12. This is otherwise known as the Transportation Planning Rule (TPR). The TPR requires that the City develop a ...
  • David Evans and Associates; Bend (Or.) (City of Bend (Or.), 1996-10)
    The purpose of Technical Memorandum #3 is to summarize and develop background information about the transportation system in the Interchange Management Study Area (IMSA) of the U.S. 97: South Parkway Murphy Interchange. ...
  • Foster Consultants; CTS Engineers; Boardman (Or.); TriLand Design Group (City of Boardman (Or.), 2001-08)
    The downtown development plan must provide accessibility to all modes of travel, accommodate and facilitate business development, intensify land uses, and enhance circulation. The downtown development plan must identify ...
  • Boardman (Or.); DKS Associates; Winterbrook Planning (Firm) (City of Boardman (Or.), 2007-06)
    This report presents the Interchange Area Management Plans for the two interstate highway connections in the City of Boardman at Main Street and at Laurel Lane. The city relies on these two interchanges for access to ...
  • Boardman (Or.); Kittelson & Associates; Cogan Owens Cogan (Firm); Murase and Associates; TriLand Design Group (City of Boardman (Or.), 2001-06)
    The City of Boardman, in conjunction with Morrow County and the Oregon Department of Transportation (ODOT), initiated a study of the city's transportation system during the summer of 1998. The purpose of this study was ...
  • Brookings (Or.); David Evans and Associates; H. Lee & Associates (City of Brookings (Or.), 2002-08)
    The City of Brookings Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Brookings (Or.); Oregon. Dept. of Transportation (City of Brookings (Or.), 2003)
    The Oregon Department of Transportation (ODOT) and the City of Brookings developed this Access Management Plan (AMP) in compliance with the Oregon Highway Plan (OHP) as well as in response to a South West Area Commission ...
  • Burns (Or.); Hines (Or.); Oregon. Dept. of Transportation; David Evans and Associates (Oregon Dept. of Transportation, 2001-01)
    The purpose of [this] report is to: 1) Complete an inventory of existing access spacing for public and private approaches along the highway segments within the urban growth boundaries (UGBs) of Bums and Hines; 2) Compare ...
  • Burns (Or.); David Evans and Associates (City of Burns (Or.), 2001-06)
    The Burns Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan constitutes ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics