Browsing Transportation plans by Title

Navigation

Display Options

Results

  • Sutherlin (Or.); SERA Architects; Cogan Owens Cogan (Firm); Oregon. Dept. of Transportation; Kittelson & Associates (City of Sutherlin (Or.), 2007-05)
    The Southside Parkway Corridor Plan was developed in anticipation of the longterm circulation needs within the City of Sutherlin. At the heart of the plan is the preferred parkway alignment. This preferred conceptual ...
  • Sutherlin (Or.); Parsons Brinckerhoff (City of Sutherlin (Or.), 2005-10)
    This Transportation System Plan (TSP) provides guidance and regulatory tools so that the City can develop its transportation system through coordinated policies and planned improvements over the next 20 years. It also ...
  • Sweet Home (Or.); W&H Pacific; Kittelson & Associates; SRI/Shapiro, Inc. (City of Sweet Home (Or.), 2003-06-20)
    The City of Sweet Home has committed to developing a well planned comprehensive transportation system that balances the needs of future land development with a system that serves all users. In the development of a ...
  • Talent (Or.); Siegel Planning Services (City of Talent (Or.), 2005-06)
    The Railroad District Master Plan is intended to guide future annexations, zoning, transportation improvements, and investments in parks, open space conservation, water, sanitary sewer, and storm water management. It is ...
  • Talent (Or.); David Evans and Associates (City of Talent (Or.), 2007-05)
    The City of Talent’s vision for the Wagner Creek Greenway is that it will be a multi-use trail providing a non-motorized travel alternative for community residents and visitors while protecting and enhancing the biological, ...
  • Tangent (Or.); Kimley-Horn and Associates (City of Tangent (Or.), 2002)
    This Transportation System Plan (TSP) is intended to meet the need for long range planning and replace the transportation element of the Comprehensive Plan. Other factors have also influenced the need for a TSP. In 1991, ...
  • Tigard (Or.); Tigard (Or.). Planning Dept.; Spencer & Kupper; Lindley, Lloyd D.; Cogan Owens Cogan (Firm); Kittelson & Associates; Levine, Claire (City of Tigard (Or.), 1999-09)
    Regional center planning was based on transportation and development capability and the area’s capacity to absorb the following minimum targets within 20 years: total employment: 9,804 jobs; retail/service: 1,188 jobs; ...
  • DKS Associates; ECO Northwest, Ltd.; Otak, Inc.; Tigard (Or.); Oregon Transportation and Growth Management Program (City of Tigard (Or.), 2007-07)
    The recommended plan was developed through a planning process of four key steps supported by a public and agency involvement effort. The planning steps were: establish inventory of existing conditions; analyze needs, ...
  • Tigard (Or.); DKS Associates (City of Tigard (Or.), 2002-01-30)
    These goals and policies have been developed to guide the Cityâ s twenty year vision of transportation system needs. They are intended to replace the current transportation related goals and policies in the Tigard ...
  • Oregon. Dept. of Transportation; Jeanne Lawson Associates; CH2M Hill, inc.; Tillamook (Or.); Tillamook County (Or.) (City of Tillamook (Or.), 2006-01)
    The Tillamook Transportation Refinement Plan was undertaken to develop solutions to three interrelated transportation issues in downtown Tillamook, Oregon: Transportation safety, with an emphasis on pedestrians; adverse ...
  • CH2M Hill, inc.; Tillamook (Or.); Angelo Eaton & Associates (City of Tillamook (Or.), 2003-06)
    The City of Tillamook Transportation System Plan (TSP) is a guide for the city to develop appropriate transportation facilities in the city. The TSP incorporates the community's vision while remaining consistent with ...
  • Toledo (Or.); W&H Pacific (City of Toledo (Or.), 1995-06)
    The City of Toledo, in conjunction with Lincoln County and the Oregon Department of Transportation (ODOT) initiated a study of the area transportation system in November 1994. This study was conducted in compliance with ...
  • Milwaukie (Or.); Milwaukie (Or.). Community Development Dept.; Milwaukie (Or.). Public Works Dept.; DKS Associates (City of Milwaukie (Or.), 1997-07-15)
    The TSP strives to: determine existing problem areas for all modes of transportation, looks into the future to identify the needs created by growth, and provides solutions to existing and future needs along with guidelines ...
  • Troutdale (Or.); DKS Associates (City of Troutdale (Or.), 2005-08-23)
    In July, 1995 the City of Troutdale adopted the first Transportation System Plan (TSP) in the Portland Metropolitan area. Since that time, there have been significant changes in regional planning efforts and requirements, ...
  • Angelo Eaton & Associates; Tualatin (Or.); Kittelson & Associates (City of Tualatin (Or.), 2001-06)
    The City of Tualatin, in conjunction with the the Oregon Department of Transportation (ODOT), initiated a study of the City's transportation system in 2000. This transportation system plan (TSP) will guide the management ...
  • Turner (Or.) (City of Turner (Or.), 1999-05-13)
    The City's Transportation System Plan is a Plan to provide an economical, efficient, safe, accessible, and multi-modal transportation system for the City of Turner, Oregon. The Transportation System Plan (TSP) satisfies ...
  • Ukiah (Or.); David Evans and Associates; Umatilla County (Or.) (City of Ukiah (Or.), 2001-06)
    The City of Ukiah Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Umatilla (Or.); Kittelson & Associates (City of Umatilla (Or.), 1999-02)
    The City of Umatilla, in conjunction with the Oregon Department of Transportation (ODOT), initiated a study of the City of Umatilla's transportation system in the late fall of 1997. The purpose of this study is to guide ...
  • Union (Or.); Otak, Inc. (City of Union (Or.), 1998-06-24)
    Key elements of the Union Transportation System Plan include: A local street network plan to identify general preference for fbture roadfutility extensions; An access management plan to protect and preserve the fbnction, ...
  • Unity (Or.); H. Lee & Associates; David Evans and Associates (City of Unity (Or.), 2001-06)
    The Unity Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan constitutes ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics