Scholars' Bank will
be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected
on 9/16. Stay tuned for more updates!
Browsing Transportation plans by Author "Kittelson & Associates"
Navigation
Display Options
Results
-
Otak, Inc.; Pacific Rim Resources, Inc.; Pendleton (Or.); Kittelson & Associates
(City of Pendleton (Or.), 1996-12-26)
The Pendleton Transportation System Plan (TSP), a joint venture between the City of Pendleton,
Umatilla County, and the Oregon Department of Transportation (ODOT), is a multimodal
plan that includes strategies to manage ...
-
Rainier (Or.); Kittelson & Associates; W&H Pacific
(City of Rainier (Or.), 1997-09)
A comprehensive analysis of the transportation system in the Rainier area has been prepared in
conjunction with the Oregon Department of Transportation, the City of Rainier, the Rainier
Transportation Plan Advisory ...
-
Sandy (Or.); Kittelson & Associates
(City of Sandy (Or.), 1997-09-29)
The goals of this study, as developed by the technical and citizen advisory committees, were
to develop a transportation system to provide mobility, improve circulation, and ensure the
safety for all travel modes; preserve, ...
-
Scappoose (Or.); Kittelson & Associates; HDR Engineering
(City of Scappoose (Or.), 2002-10)
This study provides a comprehensive review of higlway/rail grade
crossing geometric and operational opportunities and constraints. These
opportunities and constraints have been developed to address the needs
of the City ...
-
Seaside (Or.); Kittelson & Associates; Spencer & Kupper; Moore, Kathryn L.
(City of Seaside (Or.), 1997-06)
The City of Seaside, in conjunction with the Oregon Department of Transportation (ODOT)
initiated a study of the area transportation system in Fall 1996. This study has been conducted
in compliance with State of Oregon ...
-
Sherman County (Or.); Oregon. Dept. of Transportation; Kittelson & Associates
(Oregon Dept. of Transportation, 2000-12)
The Oregon Department of Transportation (ODOT) initiated the Biggs Junction Refinement Plan during the
spring of 2000. The purpose of this study is two-fold: to guide the management and development of state transportation ...
-
Walker-Macy; Urbsworks; Silverton (Or.); Kittelson & Associates
(City of Silverton (Or.), 1998-11)
This study was conducted to address downtown business and civic community concerns for providing sufficient, convenient parking for customers, residents and employees. With the future opening of the Oregon Garden, and the ...
-
Sutherlin (Or.); SERA Architects; Cogan Owens Cogan (Firm); Oregon. Dept. of Transportation; Kittelson & Associates
(City of Sutherlin (Or.), 2007-05)
The Southside Parkway Corridor Plan was developed in anticipation of the longterm
circulation needs within the City of Sutherlin. At the heart of the plan is the
preferred parkway alignment. This preferred conceptual ...
-
Sweet Home (Or.); W&H Pacific; Kittelson & Associates; SRI/Shapiro, Inc.
(City of Sweet Home (Or.), 2003-06-20)
The City of Sweet Home has committed to developing a well planned comprehensive transportation
system that balances the needs of future land development with a system that serves all users. In the
development of a ...
-
Tigard (Or.); Tigard (Or.). Planning Dept.; Spencer & Kupper; Lindley, Lloyd D.; Cogan Owens Cogan (Firm); Kittelson & Associates; Levine, Claire
(City of Tigard (Or.), 1999-09)
Regional center planning was based on
transportation and development capability
and the area’s capacity to absorb the
following minimum targets within 20
years: total employment: 9,804 jobs; retail/service: 1,188 jobs; ...
-
Angelo Eaton & Associates; Tualatin (Or.); Kittelson & Associates
(City of Tualatin (Or.), 2001-06)
The City of Tualatin, in conjunction with the the Oregon Department of Transportation (ODOT), initiated a study of the City's transportation system in 2000. This transportation system plan (TSP) will guide the management ...
-
Umatilla (Or.); Kittelson & Associates
(City of Umatilla (Or.), 1999-02)
The City of Umatilla, in conjunction with the Oregon Department of Transportation (ODOT), initiated
a study of the City of Umatilla's transportation system in the late fall of 1997. The purpose of this study
is to guide ...
-
Waldport (Or.); TriLand Design Group; Kittelson & Associates; Macdonald Environmental Planning (Firm)
(City of Waldport (Or.), 1999-06-09)
The City of Waldport has received a State of Oregon grant to prepare a Transportation System Plan (TSP). The
Plan will result in a plan to satisfy the community's transportation needs and desires for the 20 year ...
-
Woodburn (Or.); Kittelson & Associates
(City of Woodburn (Or.), 1996-06)
The plan
has a planning horizon to the year 2015, and represents for the first time a comprehensive,
multi-modal transportation plan to guide transportation investment in the City over the next 20
years.
As an input ...
-
Woodburn (Or.); CH2M Hill, inc.; Kittelson & Associates
(City of Woodburn (Or.), 2005-09)
The city of Woodburn (City), in conjunction with the Oregon Department of Transportation
(ODOT), initiated an update of the City's 1996 Transportation System Plan (TSP) in 2002.
The City of Woodburn Comprehensive Plan ...
Search Scholars' Bank
Browse
-
All of Scholars' Bank
-
This Collection
My Account
Statistics