Browsing Transportation plans by Title

Navigation

Display Options

Results

  • Ukiah (Or.); David Evans and Associates; Umatilla County (Or.) (City of Ukiah (Or.), 2001-06)
    The City of Ukiah Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Umatilla (Or.); Kittelson & Associates (City of Umatilla (Or.), 1999-02)
    The City of Umatilla, in conjunction with the Oregon Department of Transportation (ODOT), initiated a study of the City of Umatilla's transportation system in the late fall of 1997. The purpose of this study is to guide ...
  • Union (Or.); Otak, Inc. (City of Union (Or.), 1998-06-24)
    Key elements of the Union Transportation System Plan include: A local street network plan to identify general preference for fbture roadfutility extensions; An access management plan to protect and preserve the fbnction, ...
  • Unity (Or.); H. Lee & Associates; David Evans and Associates (City of Unity (Or.), 2001-06)
    The Unity Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan constitutes ...
  • Vale (Or.); W&H Pacific; TriLand Design Group (City of Vale (Or.), 1998-02)
    The City of Vale Transportation System Plan (TSP) guides the management of existing and future transportation facilities for the next 20 years. This TSP document satisfies the requirements of the Oregon Transportation ...
  • Veneta (Or.) (City of Veneta (Or.), 2007-07)
    The Fern Ridge Trail System is a long range vision. This document is a conceptual tool that provides some general insight into the need for the proposed trail system, trail siting opportunities, factors that influenced ...
  • Veneta (Or.); Lane Council of Governments (Or.) (City of Veneta (Or.), 2001-07)
    The Veneta Transportation System Plan (TSP) is the long-range policy document that guides transportation planning within Veneta’s urban growth boundary (UGB) for the next 20 years. The plan will be updated every five ...
  • Veneta (Or.) (City of Veneta (Or.), 2006-04-24)
    The Veneta Transportation System Plan (TSP) is the long-range policy document that guides transportation planning within Veneta’s urban growth boundary (UGB) for the next 20 years. The plan will be updated every five years ...
  • Vernonia (Or.); KCM, Inc. (City of Vernonia (Or.), 1999-07)
    This Transportation System Plan (TSP) identifies deficiencies of the City of Vernonia's existing transportation system, assesses current and future demands on the system, and outlines a coordinated network of transportation ...
  • Waldport (Or.); TriLand Design Group; Kittelson & Associates; Macdonald Environmental Planning (Firm) (City of Waldport (Or.), 1999-06-09)
    The City of Waldport has received a State of Oregon grant to prepare a Transportation System Plan (TSP). The Plan will result in a plan to satisfy the community's transportation needs and desires for the 20 year ...
  • Wallowa (Or.); David Evans and Associates (City of Wallowa (Or.), 2001-03)
    The Wallowa Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation ...
  • Warrenton Trails Association; Warrenton (Or.); Resource Assistance for Rural Environments (Program); RARE (City of Warrenton (Or.), 2007-07-07)
    The goal of the Warrenton Trails master Plan is to create a comprehensive network of trails that links destinations, natural features, historic landmarks, community facilities, other transportation facilities, neighborhoods, ...
  • Warrenton (Or.); Angelo Eaton & Associates; CH2M Hill, inc. (City of Warrenton (Or.), 2004-02)
    The City of Warrenton, in conjunction with the Oregon Department of Transportation (ODOT), initiated a study of the City's transportation system in 2002. The Warrenton Comprehensive Plan is currently undergoing periodic ...
  • West Linn (Or.) (City of West Linn (Or.), 2000)
    The Transportation System Plan for West Linn proposes that the City have a balanced, integrated transportation system which promotes ease of use for car drivers, pedestrians, bicyclists, and transit users. All except ...
  • DKS Associates; West Linn (Or.) (City of West Linn (Or.), 2008-10)
    In 2000, the City of West Linn adopted their first Transportation System Plan (TSP). Since that time, there has been significant growth in West Linn and its surrounding communities, and a few key changes to state highway ...
  • Oregon. Dept. of Transportation; DKS Associates; Tri-County Metropolitan Transportation District of Oregon; SERA Architects; Cogan Owens Cogan (Firm); West Linn (Or.); Metro (Or.) (City of West Linn (Or.), 2008-01-04)
    The purpose of this project was to develop a multi-modal Conceptual Design Plan for OR 43 that adequately accommodates bicycles, pedestrians, automobiles, and trucks. The final conceptual design strikes a balance between ...
  • Weston (Or.); David Evans and Associates; Umatilla County (Or.) (City of Weston (Or.), 2001-06)
    The City of Weston Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the ...
  • Wheeler (Or.); TriLand Design Group (City of Wheeler (Or.), 2001-06-19)
    The Wheeler TSP will address ways to improve the transportation system to support anticipated growth in Wheeler and associated traffic volumes in a way that will support the functioning of Highway 101 as a Statewide Highway. ...
  • Willamina (Or.) (City of Willamina (Or.), 1998-08)
    The Willamina TSP includes the following: transportation goals, policies, and objectives; a determination of transportation needs; a street plan for arterials and collectors and standards for the layout of local streets ...
  • Wilsonville (Or.); Alta Planning and Design (City of Wilsonville (Or.), 2006-12)
    Throughout the planning processes, the community expressed key priorities, including: improving access to and across the Willamette River; providing a comprehensive system of bikeways and walkways; developing a pool ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics