Browsing Individual county documents by Author "David Evans and Associates"

Navigation

Display Options

Results

  • David Evans and Associates; Greenfield, Mark J.; Cogan Owens Cogan (Firm); Baker City (Or.); Baker County (Or.) (City of Baker City (Or.), 2005-06-14)
    The I-84 Baker Interchange Area Management Plan (IAMP) for the interchange areas surrounding Interstate 84 Interchanges 302 and 306 describe existing traffic and land use patterns in the interchange areas, identify potential ...
  • DKS Associates; Urbsworks; David Evans and Associates; Clackamas County (Or.) (Clackamas County (Or.), 2007-06)
    The vision for the Fuller Road Station Area Plan is that within 20 years (by 2029), the Fuller Road light rail station area will be a vibrant mix of housing, offices and local services with excellent pedestrian connectivity ...
  • Curry County (Or.); David Evans and Associates; H. Lee & Associates (Curry County (Or.), 2005-05)
    The Curry County Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 15 years. Delays in completion of the plan ...
  • Douglas County (Or.); Oregon. Dept. of Transportation; David Evans and Associates; Roseburg (Or.) (Oregon. Dept. of Transportation, 2005-06-27)
    The purpose of this planning effort is to evaluate the operation of Interchange 123, assess the limitations and issues of concern, and, in general terms, identify possible future long-range needs attributable to planned ...
  • Douglas County (Or.); Oregon. Dept. of Transportation; David Evans and Associates; Angelo Eaton & Associates; Myrtle Creek (Or.) (Oregon. Dept. of Transportation, 2006-06)
    The goal of this IAMP is to maintain the function of the three interchanges in order to preserve the investment in the transportation facilities. The objectives of this IAMP are defined by OAR 734-051-0010 et seq. As ...
  • Douglas County (Or.); Oregon. Dept. of Transportation; David Evans and Associates; Winston (Or.) (Oregon. Dept. of Transportation, 2005-10)
    The Conditions Report project is intended as the first step in planning for long-range improvements. This initial step is needed to gain a better understanding of both the current and the future deficiencies of these two ...
  • Gilliam County (Or.); David Evans and Associates (Gilliam County (Or.), 1999-04)
    The Gilliam County Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the ...
  • Grant County (Or.); David Evans and Associates (Grant County (Or.), 1997-06)
    The TSP planning area includes all areas inside Grant County, public and private. A large foldout map displaying the Grant County planning area is located in Appendix A [not included]. The map also shows state highways ...
  • Hood River County (Or.); Cogan Owens Cogan (Firm); David Evans and Associates (Hood River County (Or.), 2003-07-21)
    The TSP was developed through technical analysis combined with input and review by a project management team, a technical advisory committee, and the public. The plan was initially prepared in 1995-1997 and subsequently ...
  • Jackson County (Or.); Jackson County Airport Authority; McPheters, Lee; David Evans and Associates; Coffman Associates (Jackson County (Or.), 2001-02)
    The Master Plan provides a step-by-step or phased outline for development and gives the Airport Authority advance notice of pending needs to aid in future scheduling and budgeting. This allows for orderly and timely ...
  • Jackson County (Or.); Central Point (Or.); Oregon. Dept. of Transportation; David Evans and Associates (Oregon Dept. of Transportation (Or.), 2005-07)
    The Oregon Department of Transportation (ODOT) and Jackson County have determined that the Interstate 5 (I-5) interchange with Oregon Route (OR) 99 and Blackwell Road in Jackson County, Oregon, is in need of modifications ...
  • Jefferson County (Or.); David Evans and Associates (Jefferson County (Or.), 1996-07)
    The preparation of the Jefferson County Transportation System Plan was a cooperative effort of Jefferson County, the Cities of Madras, Culver, Metolius, the unincorporated communities of Camp Sherman and the Crooked River ...
  • Lake County (Or.); David Evans and Associates (Lake County (Or.), 2002-12)
    The Lake County TSP was developed through a series of technical analyses combined with systematic input and review by the Transportation Advisory Committee (TAC), a local stakeholder group, ODOT, and the public. The TAC ...
  • Multnomah County (Or.); Multnomah County (Or.). Dept. of Business and Community Services; David Evans and Associates (Multnomah County (Or.), 2005-06)
    The purpose of this Rural Area Plan is to guide decision making regarding land use, capital improvements, and physical development of the Multnomah County portion of the Columbia River Gorge National Scenic Area.... Multnomah ...
  • Umatilla County (Or.); David Evans and Associates (Umatilla County (Or.), 2002-04)
    The Umatilla County Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities in Umatilla County for the next 20 years. This ...
  • Washington County (Or.); Oregon. Dept. of Transportation; David Evans and Associates (Oregon Dept. of Transportation, 2003-07)
    This plan includes an access management strategy that addresses two of the special IGA conditions detailed below: three access points located north of the new off ramp would be closed. A new service/access road will ...
  • Washington County (Or.); Oregon. Dept. of Transportation; David Evans and Associates; Angelo Eaton & Associates; Greenfield, Mark J.; Cogan Owens Cogan (Firm) (Oregon. Dept. of Transportation, 2003-01-06)
    This IAMP has been developed concurrent with refinement of the preliminary design of the interchange and with the reevaluation of an environmental assessment previously prepared for the interchange project. The objectives ...
  • Wheeler County (Or.); David Evans and Associates (Wheeler County (Or.), 2001-06)
    The Wheeler County Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics