Now showing items 1-2 of 2

    • Washington County : North Bethany concept plan stormwater infrastructure plan (2007) 

      Washington County (Or.); Otak, Inc. (Washington County (Or.), 2007-10-05)
      The purpose of the infrastructure plan is to: describe the stormwater management strategy for North Bethany; show how the strategy would be applied to the concept plan; provide a cost estimate for the stormwater ...
    • Washington County : North Bethany strategic programming (2006) 

      Washington County (Or.); Leland Consulting Group; Otak, Inc. (Washington County (Or.), 2006-12)
      The purpose of this report is to create development strategy alternatives for use in preparing the physical North Bethany Concept Plan Alternatives. The report uses tools such as market conditions, stakeholder input, ...