Now showing items 1-1 of 1

    • Madras fiber optic line project (phase 2) environmental assessment 

      Crooked River National Grassland (Or.) (2003-03-26)
      Proposes installation of a new fiber optic line, primarily on existing poles, within the existing right-of-way for the Central Electric Cooperative, Inc. (CEC) power transmission line. Designed to complement the earlier ...