Browsing Portland, Oregon Planning Documents by Title

Navigation

Display Options

Results

  • Metro (Metro, 2006-02-28)
    Titie 11 of Metro's Urban Growth Management Functional Plan establishes temporary limitations on land divisions in territory newly added to the UGB. This ordinance authorizes counties to allow creation of parcels smaller ...
  • Metro (Metro, 2006-03-20)
  • Metro (Metro, 2007-02-16)
    Deletion of the requirements for local governments to consider and adopt selected land use strategies in their comprehensive plans and implementing ordinances. Ensuring that local government plans include policies and ...
  • Metro (Metro, 2007-03-08)
    Title 4 of Metro's Urban Growth Management Functional Plan prescribes limitations on certain uses in industrial and employment areas ana references a map which depicts boundaries for regulatory purposes. Ordinance No. ...
  • Metro (Metro, 2007-04-02)
    A minor amendment to the UGB where the UGB is intended to be coterminous with the 100-year floodplain based on a recent delineation of the floodplain by a profrssional engineer registered by the State of Oregon.
  • Metro (Metro, 2007-05-23)
    A minor adjustment to the UGB to make the UGB coterminous with a built structure. The previous UGB line ran trhough a house. Adoption of this amendment allows the existing house to be wholly on the parcel that remains rural ...
  • Metro (Metro, 2008-02-06)
  • Metro (Metro, 2008-05-27)
    The addition of 0.6 acres to the UGB makes the UGB coterminous with the property line for 20303 S Highway 213 in Oregon City
  • Metro (Metro, 2008-10-10)
    A minor adjustment of the UGB to site two public facility lines to provide sanitary sewer and water to the Metro Parks & Greenspaces owned Graham Oaks Nature Park.
  • Metro (Metro, 2008-12-05)
    The adopted amendment add 1.54 acres to the UGB in order to make the UGB coterminous with property lines.
  • Metro (Metro, 2010-09-24)
    The City of Portland has requested that the Metro Council amend the Title 4 (Industrial and Other Employment Areas) map to allow uses not currently permissible. Title 4 of the Urban Growth Management Functional plan seeks ...
  • Multnomah County (Or.); Portland (Or.). Bureau of Planning; Multnomah County (Or.). Dept. of Environmental Services; Multnomah County (Or.). Division of Planning and Development (Multnomah County (Or.), 2001-10-11)
    This project, known as the Multnomah County-Portland Unincorporated Urban Area Functional Compliance Project, includes those areas of unincorporated Multnomah County that are within both the city's Urban Services boundary ...
  • Port of Portland (Or.) (Port of Portland (Or.), 2008-01-09)
    The Port Transportation Improvement Plan is a multimodal compilation of marine terminal, road, rail, waterway, transit, bicycle, and pedestrian projects, normally identified through transportation and other studies managed ...
  • Port of Portland (Or.); Portland (Or.). Bureau of Planning; Jacobs Consultancy; Alcantar & Associates; Cephas, Inc.; David Evans and Associates; DKS Associates; NEXTOR; Parametrix, Inc.; Synergy Consultants; Zimmer Gunsul Frasca (Port of Portland (Or.), 2008-09)
    This technical memorandum summarizes the aviation demand forecasts prepared for the 2010 Portland International Airport Master Plan Update. This technical memorandum also provides historical data on the regional population ...
  • Port of Portland (Or.); Jacobs Consultancy; HNTB Corporation; Alcantar & Associates; Cephas, Inc.; David Evans and Associates; DKS Associates; NEXTOR; Zimmer Gunsul Frasca; Parametrix, Inc.; Synergy Consultants; Portland (Or.). Bureau of Planning (Port of Portland (Or.), 2008-09)
    This technical memorandum presents an inventory of existing conditions (Inventory) related to the role of Portland International Airport (the Airport, or PDX) within the region, its current operations and facilities, and ...
  • Port of Portland (Or.); W&H Pacific (Port of Portland (Or.), 2008-04)
    The Port and the Federal Aviation Administration (FAA) initiated a Master Plan Update project in 2006. An Airport Master Plan is a 20-year guide that outlines how the physical development of an airport can satisfy ...
  • Port of Portland (Or.); Portland (Or.). Bureau of Planning; Portland Development Commission (Port of Portland (Or.), 2006-12)
    The Working Harbor Reinvestment Strategy will be a 10-year program of coordinated public investments by the City of Portland, Portland Development Commission (PDC), and Port of Portland in the economic vitality of the ...
  • Port Orford (Port Orford, 2007-09-25)
    The City of Port Orford has adopted a new Battle Rock Mixed Use Zone (10-MU) for the southern portion of the City to replace portions of the Commercial mixed use (4-C) zone that was in effect. The new zone removes heavy ...
  • Port Orford (Port Orford, 2008-03-24)
    The City of Port Orford has adopted a new Commercial-Residential Overlay within the Battle Rock Mixed Use Zone (10-MU) to replace portions of the Battle Roc Mixed Use (10-MU) zone that was in effect. The new zone limits ...
  • Port Orford (Port Orford, 2008-09-19)
    "Update specific minor and major partitioning standards and procedures to reflect the requirements of ORS 92 and City needs; Update final plat requirements. Update residential zones to include uses required by Oregon law ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics