  • Newberg (Or.); Brown and Caldwell (City of Newberg (Or.), 2007-06-21)
    Demands on the sanitary collection system are expanding as Newberg’s population grows. Land use and population have changed substantially since the preparation of the Sewerage Master Plan in 1985. Then, the City’s population ...
  • Newberg (Or.) (City of Newberg (Or.), 2007-07-16)
    Goals of the Facilities Plan Update: meeting existing and predicted regulatory requirements to protect the environment; prepare for community growth; ensure the maintenance of the City's valuable community investment. ...
  • Civil West Engineering Services, Inc.; Newport (Or.) (City of Newport (Or.), 2008-11)
    The purpose of this section is to provide a summary of the basic information contained in the body of this master planning effort. The Executive Summary section briefs readers who want to quickly obtain the main points ...
  • Deca Architecture, Inc.; Oregon City (Or.). Public Works Dept.; Oregon City (Or.) (City of Oregon City (Or.), 2005-12-14)
    In December 2003, the City of Oregon City retained the services of DECA Architecture, Inc.. to prepare a Facilities Plan for their Oregon City Public Works Operations Division (OCPW). The purpose of the study is to analyze ...
  • Tetra Tech/KCM, Inc.; Oregon City (Or.) (City of Oregon City (Or.), 2003-12)
    Preparation of the master plan involved the following elements: document the existing sewer system; assess existing and future wastewater flows; evaluate sewer capacity and projected capacity needs; evaluate pump station ...
  • West Yost and Associates; Oregon City (Or.) (City of Oregon City (Or.), 2004-10)
    This master plan presents the results of the water distribution system planning effort conducted for the City of Oregon City. The plan summarizes the components of the existing water distribution system, analyzes local ...
  • Portland (Or.); Portland (Or.). Bureau of Planning; Portland (Or.). City Asset Managers Group (City of Portland (Or.), 2008-02-21)
    The report responds directly to a key Council focus area: to rebuild and maintain the City’s infrastructure. A properly maintained and sound infrastructure is critical to delivering the quality services Portland’s citizens ...
  • Portland (Or.); Portland (Or.). Bureau of Planning; Portland (Or.). City Asset Managers Group (City of Portland (Or.), 2007-01-19)
    This is the fourth year of reporting on the status and condition of the City's physical infrastructure. In 2005, the City changed from focusing on a single condition of assets (deteriorating infrastructure) to a more ...
  • Portland (Or.); Portland (Or.). Bureau of Planning and Sustainability; Portland (Or.). City Asset Managers Group (City of Portland (Or.), 2008-12)
    This sixth report on the status and condition of the City's physical infrastructure takes a holistic approach to ensure that the City’s assets are adequate to provide desired levels of service. This report seeks to provide ...
  • Portland (Or.); Portland (Or.). Bureau of Environmental Services; KPFF Consulting Engineers; Landsman Transportation Planning; Walker-Macy; Portland Development Commission; Portland (Or.). Office of Transportation; Portland (Or.). Bureau of Planning (City of Portland (Or.), 2008-02)
    This report begins with a brief summary of the project background and context, followed by the City’s Green Street Goals. The process for this effort is then summarized along with the team’s approach to Green Street Design ...
  • Redmond (Or.) (City of Redmond (Or.), 2008-03-11)
    With expansion of the UGB, there became an immediate need to update all existing infrastructure master plans to determine necessary new public infrastructure facilities within the new 2,299 acre expansion areas. Given ...
  • Salem (Or.) (City of Salem (Or.), 2007-07-01)
    The CIP is a business document, which identifies programs and schedules, and presents a financing strategy for capital improvements. The CIP utilizes different infrastructure master plans (i.e. parks, shops facilities, ...
  • Sherwood (Or.); Murray, Smith & Associates; Groundwater Solutions, Inc.; Financial Consulting Solutions Group (City of Sherwood (Or.), 2005-08)
    The purpose of this study is to perform a comprehensive analysis of the City of Sherwood’s water distribution system, to identify system deficiencies, to determine future water distribution system supply requirements, ...
  • Silverton (Or.); HDR Engineering (City of Silverton (Or.), 2007-02)
    Over the past 10 years, the City of Silverton has implemented many improvements to provide quality service to ratepayers and protect the sensitive natural environment that contributes to the area’s scenic beauty. The ...
  • Springfield (Or.); Springfield (Or.). Public Works Dept. (City of Springfield (Or.), 2007-03)
    This program provides a list of public facilities such as street paving, sewer installation, and traffic safety projects that are programmed for funding in the next five years. [From the document]
  • Springfield (Or.); Springfield (Or.). Dept. of Public Works. Environmental Services Division (City of Springfield (Or.), 2004-01)
    The Springfield Stormwater Management Plan (Stormwater Plan) has been developed to provide policy and management guidance for activities affecting stormwater throughout the City of Springfield and its urbanizable area. ...
  • CH2M Hill, inc.; Springfield (Or.) (Springfield (Or.), 2008-06)
    The Springfield Wastewater System Master Plan is intended to identify existing and future capacity constraints, determine capacity requirements and identify system improvements necessary to meet the city of Springfield's ...
  • Stayton (Or.); Keller Associates (City of Stayton (Or.), 2008-05)
    The primary objectives of this Storm Water Master Plan are: establish storm system design and planning criteria; evaluate the existing storm system using computer hydraulic modeling; summarize existing system deficiencies ...
  • Stayton (Or.); Keller Associates (City of Stayton (Or.), 2006-02)
    The purpose of this study is to provide an assessment of the existing SBR plant and to develop a master plan and capital improvement plan that address: compliance with existing and anticipated future NPDES permit lim ...
  • Stayton (Or.); Keller Associates (City of Stayton (Or.), 2006-01)