Now showing items 1-17 of 17

    • Billy Tower thin documentation of land use plan conformance and NEPA adequacy 

      United States. Bureau of Land Management. Eugene District (2007-05-30)
      Announces decision concluding that project conforms to the applicable land use plan and that the NEPA documentation fully covers the proposed action. Project proposes to thin commercially approximately 315 acres within the ...
    • Brush and Childers Creek aquatic habitat restoration finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-06-25)
      Announces decision to implement project restoring the spatial and temporal connectivity of the aquatic system by improving fish passage at an existing road-stream crossing, enhancing aquatic and riparian habitat for resident ...
    • Camp Run timber sale finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2008-06-18)
      Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the proposed Camp Run Project (EA-OR090-07-06) was prepared by the Upper Willamette Resource Area, Eugene District of the Bureau of Land ...
    • Drury Bunks timber sale decision notice 

      United States. Bureau of Land Management. Eugene District (2008-02-25)
      Announces decision implementing Alternative 2 of project EA to proceed with Drury Bunks timber sale as part of plan to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural ...
    • ERFO roads finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-06-25)
      Announces decision implementing project on two sites. Includes repairing the site of the fill failure on road 16-3E-34, restoring the road surface, realigning the road approximately eight feet, installing needed crossdrains ...
    • ERFO roads finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-06-25)
      Announces implementation of repairing one road and decommissioning another damaged by storms. Includes restoring road surface, realigning road, installing crossdrains and culverts, removing about twelve trees, and revegetating ...
    • Hatchery Creek timber sale decision record 

      United States. Bureau of Land Management. Eugene District (2008-08-08)
      An Environmental Assessment (EA) and Finding of No Significant Impacts (FONSI) for the proposed McKenzie Tribs Projects (EA-OR090-08-01) were prepared by the Upper Willamette Resource Area, Eugene District of the Bureau ...
    • McGowan/Parsons project environmental assessment 

      United States. Bureau of Land Management. Eugene District (2006-05-03)
      Proposes to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and to treat stands to accelerate the ...
    • McGowan/Parsons project finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-06-20)
      Announces decision to implement project providing a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and to ...
    • McKenzie Tribs environmental asssessment 

      United States. Bureau of Land Management. Eugene District (2007-11-13)
      Proposes to provide a sustainable supply of timber while maintaining valuable structural components (snags and down wood) and to provide habitat for a variety of organisms associated with both late-successional and younger ...
    • Mohawk East project environmental assessment 

      United States. Bureau of Land Management. Eugene District (2007-12-10)
      Proposes to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and treat stands to accelerate the ...
    • Mohawk River timber sale finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-10-25)
      Announces decision implementing Alternative 2 of the Mohawk East project EA, providing a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat ...
    • North Lake Creek thinning project environmental assessment, decision record and finding of no significant impact 

      United States. Bureau of Land Management. Eugene District (2005-06-07)
      EA proposes thinning of GFMA and Riparian Reserve by commercial timber harvest, down wood creation in and near stream channels, road construction, renovation, and decommissioning. Decision notice selects Alternative E of ...
    • Seeley Creek project environmental assessment 

      United States. Bureau of Land Management. Eugene District (2008-06-17)
      Proposes to implement a commercial thinning project and aquatic habitat restoration on approximately 760 acres in the Mohawk watershed, including timber harvest, instream habitat restoration, and road construction, ...
    • Transition Management environmental assessment and finding of no significant impact 

      United States. Bureau of Land Management. Eugene District (2008-05-07)
      EA proposes to grant owners of private land permission to cross lands managed by the BLM to gain legal access to their timber lands. Proposed action is to re-commission (improve) two existing roads with some new construction ...
    • Upper Siuslaw landscape plan environmental assessment 

      United States. Bureau of Land Management. Eugene District (2008-12-10)
      Actions analyzed in this EA include density management and commercial thinning, riparian enhancement treatments, botanical restoration treatments, culvert replacements/removals, and road construction, renovation, ...
    • Warner Roost finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-02-20)
      Announces implementation of Alternative 2 of project EA, accelerating the development of suitable nesting and roosting habitat for bald eagles by thinning uplands and riparian reserve areas on 350 acres, creating snag and ...