Browsing Forest Service by Title

Navigation

Display Options

Results

  • Bend-Fort Rock Ranger District (Or.) (2008-02-28)
    Announces decision to authorize implementation of Alternative 2 of project EA, bettering recreational infrastructure, public safety and satisfaction by improving the boat ramps at Gull Point and North Wickiup. Includes ...
  • Bend-Fort Rock Ranger District (Or.) (2007-11)
    Proposes to better recreation infrastructure, public safety and satisfaction by improving the boat ramps at Gull Point and North Wickiup. Includes replacing existing ramp to provide safe boat launching facilities for boaters ...
  • Sisters Ranger District (Or.) (2008-06-27)
    Announces decision after the Need for Action, the Purpose of the Project, the interdisciplinary team analysis, and the public comment to salvage log some 2.86 million board feet on 218 acres of fire-killed timber, including ...
  • Sisters Ranger District (Or.) (2008-04-15)
    Announces decision to implement the proposed action, to salvage log about 218 acres of fire killed timber, including white fir, ponderosa pine, and Douglas-fir. Includes ground-based logging, use of temporary roads, ...
  • McKenzie River Ranger District (Or.) (2005-07-29)
    Announces decision to implement Alternative 4 of project EA, harvesting 706 acres, including 563 acres of thinning and 143 acres of regeneration harvest to be done later. This alternative will reduce the stand diversity ...
  • McKenzie River Ranger District (Or.) (2005-04)
    Proposes to harvest timber on approximately 706 acres, including commercial thinning on 622 acres and regeneration harvest on 84 acres, with commercial harvest volume estimated at 11.6 million board feet. Includes construction ...
  • Lookout Mountain Ranger District (Or.) (2007-06-15)
    Announces decision to implement salvage harvest to recover the economic value of approximately 100 MBF of blown down timber. Most of the down trees are ponderosa pine and will be harvested using tractor logging methods.
  • Detroit Ranger District (Or.) (2005-08)
    Announces decision to implement Alternative 2 of the project EA, to clear one acre of land immediately adjacent to the existing quarry of existing vegetation, strip it of topsoil, quarry it, and stockpile on the existing ...
  • Detroit Ranger District (Or.) (2005-06)
    Proposes to expand existing rock source on the edge of the existing area in an 18 year-old conifer plantation 2 miles west of Cub Point in order to provide aggregate for road reconstruction and maintenance. Expansion would ...
  • Crescent Ranger District (Or.) (2003-09-29)
    Announces decision to implement 12 miles of hazard tree removal on main roads within the Davis Fire area, including selected major roads within and along the perimeter. Includes felling all dead trees over 6 inches in ...
  • Middle Fork Ranger District (Or.) (2007)
    Proposes to sell a two-acre parcel of land to the Hazeldell Rural Fire Protection District for use as a fire station site in the eastern end of the High Prairie rural residential area, about six miles north of the city of ...
  • Willamette National Forest (Agency : U.S.) (2007-10-31)
    Announces decision to implement Alternative 3 of the project EA to thin commercially about 3,762 acres of 35-60 year-old second-growth stands to accelerate the development of late-successional forest conditions and habitat ...
  • Middle Fork Ranger District (Or.) (2007-10-31)
    Announces decision to implement Alternative 3 of the project EA, to thin commercially about 3762 acres of 35-60 year-old second-growth stands to accelerate the development of late-successional forest conditions and habitat ...
  • Middle Fork Ranger District (Or.) (2007-06)
    Proposes commercial thinning on about 3800 acres of older plantations (35-60 years-old) located in the Hehe Creek subwatershed of the Fall Creek Late-successional Reserve. Includes maintenance and reconstruction of various ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2003-07-21)
    FEIS analyzes five alternatives seeking to make management, utilization, and disposal of natural resources compatible with the HCNRA Act. Record of decision announces selection of the preferred Alternative E-modified, which ...
  • Sisters Ranger District (Or.) (2001-06)
    Friends of the Metolius proposed that the Forest Service analyze and implement this collaborative project as a demonstration of forest management methods, with the interest of educating the public about the need for, and ...
  • North Fork John Day Ranger District (Or.); Wallowa-Whitman National Forest (Agency : U.S.) (2007-07)
    EA proposes to reauthorize livestock grazing and implement protective measures for sensitive plants and improved livestock distribution. Includes improving or maintaining upland vegetation conditions and allowing for forage ...
  • Prairie City Ranger District (Or.) (2004-09-20)
    Announces decision to salvage approximately 209 acres of dead and dying trees burned by the 13,535-acre fire in 2002. Includes construction of about 300 feet of temporary access road, economic value recovery from about ...
  • McKenzie River Ranger District (Or.) (2004-09)
    Announces decision to implement Alternative A of project EA, to encourage summertime use of ski facilities which will attract additional visitors with a new slide constructed along with mitigation measures, minimizing any ...
  • McKenzie River Ranger District (Or.) (2004-06)
    Proposes to amend the Special Use Permit to authorize Hoodoo Ski Area to construct and operate a summer use alpine slide within their permit area, estimated to be 3040 feet in length from the top of a central ski run to ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics