Browsing Forest Service by Title

Navigation

Display Options

Results

  • Central Coast Ranger District (Or.) (2006-09)
    Announces decision to implement Alternative 2, to speed the development of late-successional habitat in late-successional and riparian reserves; maintain and create grass, forb, and shrub, and shrub habitats; improve ...
  • Central Coast Ranger District (Or.) (2006-09)
    Proposes a package of associated terrestrial and watershed restoration actions, including commercially thinning about 3,003 acres to speed the development of late-successional habitat in plantations now 20 to 58 years-old, ...
  • Bend-Fort Rock Ranger District (Or.) (2005-09-09)
    Proposes to fall and remove live overstory trees excess to cavity nester habitat needs that are greater than or equal to 4 inches dbh and less than 21 inches dbh. Includes those with and without dwarf mistletoe, retaining ...
  • Bend-Fort Rock Ranger District (Or.) (2005-09)
    Proposes to fall and remove live overstory trees excess to cavity nester habitat needs that are greater than equal to 4 inches dbh and less than 21 inches dbh. Includes those with and without dwarf mistletoe, retaining ...
  • Walla Walla Ranger District (Wash.) (2007-02-19)
    Proposes to use fuel treatments in the Upper Grande Ronde Watersheds to reduce surface and aerial fuels on approximately 2,870 acres using various treatments including timber harvest and prescribed fire. Includes harvesting ...
  • Lookout Mountain Ranger District (Or.) (2004-04-06)
    Announces decision to implement the use of prescribed fire on approximately 3900 acres and noncommercial mechanical thinning treatments on about 990 acres within the Lower Crooked River Watershed.
  • Walla Walla Ranger District (Wash.) (2005-06)
    EA proposes to reduce fuels in seven areas that cover approximately 4301 acres using prescribed fire (3000 acres), handcutting, piling and burning of fuels (53 acres), and timber harvest (220 acres). Timber harvest would ...
  • South Zone Ranger District (Or.) (2002-09)
    Announces decision to implement Alternative 1 of the project EA, except for adding large wood to Sweet and Walker Creeks. Includes package of two separate restoration actions: one, focusing on terrestrial restoration by ...
  • South Zone Ranger District (Or.) (2002)
    Proposes a package of two separate restoration actions: one, focusing on terrestrial restoration by maintaining stand health and growth, enhancing stand structure and diversity in plantations now 25 to 51 years-old; the ...
  • Sisters Ranger District (Or.) (2002-04-03)
    Proposes to exchange the Lake Creek property, privately held by Metolius, LLC, for the Forest Service-owned Cliff and School properties. The Cliff property currently has an encroachment authorized by a special use permit ...
  • Crooked River National Grassland (Or.) (2003-03-26)
    Proposes installation of a new fiber optic line, primarily on existing poles, within the existing right-of-way for the Central Electric Cooperative, Inc. (CEC) power transmission line. Designed to complement the earlier ...
  • Lookout Mountain Ranger District (Or.) (2005-08-03)
    Announces decision to thin small conifer trees in 14 aspen stands over about 100 acres to enhance vigor and growth. Includes thinning trees up to 12 inches dbh and spacing conifers to an average of 18-by-18 feet.
  • Lookout Mountain Ranger District (Or.) (2006-06)
    Proposes to meet demand for livestock forage in allotments and improve stream shade and bank stability by improving resource conditions and livestock distribution. Includes reauthorizing livestock grazing and issuing term ...
  • Lookout Mountain Ranger District (Or.) (2006-09)
    FEIS proposes to meet demand for livestock forage in allotments and improve stream shade and bank stability by improving resource conditions and livestock distribution. Includes reauthorizing livestock grazing and issuing ...
  • Sisters Ranger District (Or.) (2001-10-18)
    Announces implementation of Alternative 4 of the project EA with minor modifications, using a combination of vegetation and fuel management on approximately 5000 acres (about one-third of the project area). Includes ...
  • La Grande Ranger District (Or.) (2002)
    Documents the completed update for the 1994 Upper Grande Ronde Watershed Analysis, investigating needs, opportunities, priorities, effects, and success measurements. Includes description, issues, key questions and relevant ...
  • La Grande Ranger District (Or.) (2002)
    Documents the completed update for the 1994 Upper Grande Ronde Watershed Analysis, investigating needs, opportunities, priorities, effects, and success measurements. Includes description, issues, key questions and relevant ...
  • Lookout Mountain Ranger District (Or.) (2006-08-29)
    Announces decision to issue a new special use permit for Kyle E. Meisner to occupy and use National Forest System land to collect and transport water for domestic use. Facilities include an enclosure fence, spring box, and ...
  • Bend-Fort Rock Ranger District (Or.) (2008-04-11)
    Announces decision to implement a modified Alternative 3 of the project EA, including providing 120 additional spaces in the parking lot, constructing a shelter of up to 1370 square feet, providing a 1 acre staging area, ...
  • Bend-Fort Rock Ranger District (Or.) (2008-01)
    Proposes to develop and improve facilities for Nordic skiers. Includes providing 9.7 miles of new trails, removing vegetation along the sides of existing roads and trails, expanding the grooming area, building a terrain ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics