Browsing NEPA Documents by Title

Navigation

Display Options

Results

  • Hebo Ranger District (Agency : U.S.) (2006-11-13)
    Announces decision to implement Alternative 2 of the project EA (with the exception of Unit 8), to thin commercially 347 acres of young managed conifer stands in the vicinity of Deadwood Mountain and Pea Ridge, to realign ...
  • Hebo Ranger District (Agency : U.S.) (2006-04)
    Proposes to improve watershed and habitat for aquatic and terrestrial species by thinning commercially 347 acres of young managed conifer stands in the vicinity of Deadwood Mountain and Pea Ridge, and to realign and ...
  • Bend-Fort Rock Ranger District (Or.) (2001-12-26)
    Announces decision to implement Alternative 3 of project EA, authorizing vegetation management activities on approximately 5283 acres. Includes closing 63 miles of road, resurfacing 12 miles of roads, designating 32 dispersed ...
  • Umpqua National Forest (Agency : U.S.) (2008-05-08)
    Announces decision initiating project, including: Commercial thinning 1000 acres of timber stands using helicopter, groundbased, and skyline logging systems in both the matrix and riparian reserve land allocations to ...
  • Umpqua National Forest (Agency : U.S.) (2008-04)
    Proposed action includes: Of the 1,282 acre planning area, commercial thinning 1000 acres of timber stands using helicopter, ground-based, and skyline logging systems in both the matrix and riparian reserve land allocations ...
  • South Zone Ranger District (Or.) (2005)
    Announces decision to restore terrestrial and aquatic habitat in the Lower Drift Creek area by: restoring tidal flows by breaching levees and recreating stream channels; reducing the effects of past land reclamation projects ...
  • South Zone Ranger District (Or.) (2005-09)
    Proposes to eradicate giant knotweed (polygonum sachalinense), an invasive plant and noxious weed, by injecting the herbicide glyphosphate into individual plant stems.
  • South Zone Ranger District (Or.) (2005-09)
    Announces decision to implement Alternative 3 of the project EA, eradicating the colonies of giant knotweed by injecting stems of individual plants with glyphosate.
  • Hebo Ranger District (Agency : U.S.) (2005-09-14)
    Announces decision to implement Article 2 of the project EA, decommissioning about 6 miles of non-key Forest roads and constructing a parking area for about 3 vehicles near the north entrance of the Drift Key Bridge, as ...
  • Hebo Ranger District (Agency : U.S.) (2005)
    Proposes to decommission about 6 miles of non-key Forest roads and construct a small parking area for about three vehicles near the north entrance of the Drift Creek Bridge, as current budget allocations do not provide ...
  • Lookout Mountain Ranger District (Or.) (2008-04)
    Proposes to use commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains for the treatment of fuels and vegetation management. Includes ...
  • Lookout Mountain Ranger District (Or.) (2008-07)
    Proposes to use commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains for the treatment of fuels and vegetation management. Includes ...
  • Lookout Mountain Ranger District (Or.) (2008-07-08)
    Announces decision implementing modified version of Alternative 2 of FEIS, using commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains ...
  • Bend-Fort Rock Ranger District (Or.) (2006-07)
    Proposes to reduce hazardous fuels in the wildland-urban interface around and adjacent to Sunriver, the Inn of the 7th Mountain, and the Highland subdivision area of Bend, and to provide obvious, safe access and evacuation ...
  • Bend-Fort Rock Ranger District (Or.) (2006-07)
    Proposes to reduce hazardous fuels in the wildfire-urban interface around and adjacent to Sunriver, the Inn of the 7th Mountain, and the Highlands subdivision area of Bend, and to provide obvious, safe access and evacuation ...
  • Willamette National Forest (Agency : U.S.) (2007-07-02)
    Announces decision to implement Alternative 2 of project EA, to close up to 23 miles of roads in the Echo, Staley, Simpson, and Noisy Creek drainages within the Upper Middle Fork watershed to motorized traffic, and place ...
  • Willamette National Forest (Agency : U.S.) (2007-04)
    Proposes to close up to 23 miles of roads in the Echo, Staley, Simpson, and Noisy Creek drainages within the Upper Middle Fork watershed to motorized traffic, and place about 21 miles of these roads into maintenance storage ...
  • Umpqua National Forest (Agency : U.S.) (2008-09-03)
    Announces decision to implement Alternative 4 of project EA, implementing commercial thinning of about 1,835 acres of timber stands using helicopter, ground-based, and skyline logging systems in AMA, Matrix and Riparian ...
  • Umpqua National Forest (Agency : U.S.) (2008-06)
    Proposes commercial thinning of about 1,835 acres of timber stands using helicopter, ground-based, and skyline logging systems in AMA, Matrix and Riparian Reserve land allocations generating about 25 million board feet ...
  • Bend-Fort Rock Ranger District (Or.) (2006-02-13)
    Announces decision to issue a special use permit for prospecting to Empire Stone Company to explore for decorative stone material. Includes digging up to 10 holes approximately 5' x 5' in size in preselected locations to ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics