Now showing items 1-20 of 32

    • B&B Fire recovery project draft environmental impact statement 

      Sisters Ranger District (Or.) (2005-03)
      Proposes to harvest fire-killed and damaged trees, reduce fuels, plant trees, remove trees that are hazardous to public safety, and reduce unneeded roads. Includes salvage harvesting on 6803 acres, removal or cutting of ...
    • B&B Fire recovery project final environmental impact statement 

      Sisters Ranger District (Or.) (2005-06-30)
      Proposes to harvest fire-killed and damaged trees, reduce fuels, plant trees, remove trees that are hazardous to public safety, and reduce unneeded roads. Includes salvage harvest, fuels reduction and reforestation on ...
    • B&B Fire recovery project record of decision 

      Sisters Ranger District (Or.) (2005-08-02)
      Announces decision implementing Alternative 2 of project FEIS, harvesting fire-killed and damaged trees, reducing fuels, planting trees, removing trees that are hazardous to public safety, and reducing unneeded roads. ...
    • Black Crater Fire roadside danger tree removal final decision memo 

      Sisters Ranger District (Or.) (2006-12-08)
      Announces decision after review of project EA and public comments on the Preliminary Decision Memo, to implement proposed action felling fire-killed danger trees adjacent to Forest roads. Includes ground-based logging of ...
    • Black Crater Fire roadside danger tree removal preliminary decision memo 

      Sisters Ranger District (Or.) (2006-10-26)
      Announces decision to implement proposed action felling fire-killed danger trees adjacent to Forest roads. Includes ground-based logging of about 8 acres and 150 thousand board feet of killed ponderosa pine and white fir, ...
    • Black Crater Fire timber salvage project preliminary decision memo 

      Sisters Ranger District (Or.) (2006-12-12)
      Announces decision to harvest about 2.25 million board feet of fire-killed timber from 201 acres from a fire of July 24, 2006. Dead trees of all species and heavily scorched white fir and lodgepole pine that have a low ...
    • Bugs thinning project decision notice and finding of no significant impact 

      Sisters Ranger District (Or.) (2001-10-01)
      Announces decision to implement Alternative 2 of the project EA, responding to the high mortality caused by the spruce budworm by thinning some 170,000 board feet of green trees on approximately 630 acres of forest stands ...
    • City of Sisters Townsite Act conveyance environmental assessment 

      Sisters Ranger District (Or.) (1999-07-26)
      Announces decision to implement Alternative C of the project EA, immediately approving 160 of the 240 acres of National Forest lands for conveyance to the City of Sisters under the authority of the 1958 National Forest ...
    • City of Sisters Townsite Act conveyance environmental assessment 

      Sisters Ranger District (Or.) (1999-05)
      Proposes to sell 240 acres of National Forest lands under the authority of the 1958 National Forest Townsite Act to the city for a sewage and wastewater facility system. Conveyance would be limited to that essential to ...
    • Eyerly Fire salvage project final environmental impact statement 

      Sisters Ranger District (Or.) (2004-07)
      Proposes to respond to the 2002 fire by salvage, fuels treatment, and reforestation. Includes salvaging the economic value of dead and dying trees and reducing fuels available to future wildland fires on approximately 4846 ...
    • Eyerly Fire salvage project record of decision and non-significant amendment #33 

      Sisters Ranger District (Or.) (2004-08-02)
      Announces implementation of Article 2 of project FEIS, responding to the 2002 fire by salvage, fuels treatment, and reforestation. Includes salvaging the economic value of dead and dying trees and reducing fuels available ...
    • Glaze Forest restoration project decision notice and response to public comments 

      Sisters Ranger District (Or.) (2008-03)
      Announces decision to implement Alternative 2 modified of project EA, restoring old-growth and second growth forests and Riparian Habitat Conservation Areas in Glaze Forest with ecologically-driven tree thinning, shrub ...
    • Glaze Forest restoration project environmental assessment 

      Sisters Ranger District (Or.) (2008-03)
      Proposes to restore old-growth and second growth forests and Riparian Habitat Conservation Areas in Glaze Forest with ecologically-driven tree thinning, shrub mowing and prescribed fire on approximately 1200 acres. Includes ...
    • GW fire timber salvage project final decision memo 

      Sisters Ranger District (Or.) (2008-06-27)
      Announces decision after the Need for Action, the Purpose of the Project, the interdisciplinary team analysis, and the public comment to salvage log some 2.86 million board feet on 218 acres of fire-killed timber, including ...
    • GW fire timber salvage project preliminary decision memo 

      Sisters Ranger District (Or.) (2008-04-15)
      Announces decision to implement the proposed action, to salvage log about 218 acres of fire killed timber, including white fir, ponderosa pine, and Douglas-fir. Includes ground-based logging, use of temporary roads, ...
    • Heritage forest demonstration environmental assessment 

      Sisters Ranger District (Or.) (2001-06)
      Friends of the Metolius proposed that the Forest Service analyze and implement this collaborative project as a demonstration of forest management methods, with the interest of educating the public about the need for, and ...
    • Lundgren land exchange environmental assessment 

      Sisters Ranger District (Or.) (2002-04-03)
      Proposes to exchange the Lake Creek property, privately held by Metolius, LLC, for the Forest Service-owned Cliff and School properties. The Cliff property currently has an encroachment authorized by a special use permit ...
    • McCache vegetation management project decision notice, Forest Plan amendment, and finding of no significant impact 

      Sisters Ranger District (Or.) (2001-10-18)
      Announces implementation of Alternative 4 of the project EA with minor modifications, using a combination of vegetation and fuel management on approximately 5000 acres (about one-third of the project area). Includes ...
    • Metolius Basin forest management project draft environmental impact statement 

      Sisters Ranger District (Or.) (2002-12)
      Proposes to implement fuel reduction and forest health management activities on 12,648 acres to reduce risk of wildfire, insects and disease; protect the safety of people, property, and tribal and natural resources; restore ...
    • Metolius Basin forest management project final environmental impact statement and record of decision 

      Sisters Ranger District (Or.) (2003-07)
      FEIS proposes to implement fuel reductions and forest health management activities on 12, 648 acres to reduce risk of wildfire, insects, and disease; protect the safety of people, property, and tribal and natural resources; ...