Now showing items 1-20 of 28

    • Spot salvage timber sale project environmental assessment 

      McKenzie River Ranger District (Or.) (2001-06)
      Proposes to fall 205 hazardous trees on 22 acres adjacent to state and federal highways, and include 171 trees in a salvage timber sale that would yield an estimated 100 thousand board feet. The remaining 34 trees, including ...
    • West Fork Horse Creek Bridge rehabilitation project environmental asessment 

      McKenzie River Ranger District (Or.) (2002-06)
      Proposes to rehabilitate the 52 year-old West Fork Horse Creek Bridge on Delta Road, including structural repairs throughout, and replacement of portions of the deteriorated glulam truss members. A temporary bridge would ...
    • Fish Lake interpretive facility environmental assessment 

      McKenzie River Ranger District (Or.) (2002-06-14)
      Proposes actions to develop an interpretive gateway facility to the historic Fish Lake Remount Depot, educating the public about the site's significance, making historic features more visible and accessible, and controlling ...
    • Nineteen Road salvage timber sale project environmental assessment 

      McKenzie River Ranger District (Or.) (2002-07)
      Proposes to fall about 204 hazardous trees in 18 acres adjacent to Forest Service Road 19, and include 168 trees in a salvage timber sale that would yield an estimated 200 thousand board feet. The remaining 36 trees would ...
    • Trapper project environmental assessment 

      McKenzie River Ranger District (Or.) (2003-03)
      Proposes to implement portion of recommendations found in the Blue River Landscape Strategy, a recommended landscape management and watershed restoration plan, an administrative study designed to measure effects on the ...
    • Trapper project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2003-05)
      Announces decision to implement Alternative B from project EA, using timber harvesting techniques, prescribed fire, and snag creation methods to approximate stand structures resulting from historic high security, ...
    • Shadow salvage timber sale environmental assessment 

      McKenzie River Ranger District (Or.) (2003-05)
      Proposes salvaging about 70 thousand board feet (MBF) of windthrown trees (about 15 log truck loads), felling about 31 hazard trees along the six-mile haul route as part of a timber sale contract intended to mitigate impacts ...
    • Shadow salvage project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2003-06)
      Announces decision to implement Alternative B of the project EA, because it satisfies the primary purpose and need to salvage commercially windthrown trees and portions of felled hazard trees in a timely manner while they ...
    • Upper McKenzie River aquatic restoration environmental assessment 

      McKenzie River Ranger District (Or.) (2004-02)
      Proposes supplementation of existing woody material to act as flow deflection and capture spawning gravels in the McKenzie River channel upstream of Trail Bridge Dam. Existing material would be supplemented with trees ...
    • Hoodoo alpine slide environmental assessment 

      McKenzie River Ranger District (Or.) (2004-06)
      Proposes to amend the Special Use Permit to authorize Hoodoo Ski Area to construct and operate a summer use alpine slide within their permit area, estimated to be 3040 feet in length from the top of a central ski run to ...
    • Hoodoo alpine slide decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2004-09)
      Announces decision to implement Alternative A of project EA, to encourage summertime use of ski facilities which will attract additional visitors with a new slide constructed along with mitigation measures, minimizing any ...
    • Hartz young stand management environmental assessment 

      McKenzie River Ranger District (Or.) (2005-04)
      Proposes to harvest timber on approximately 706 acres, including commercial thinning on 622 acres and regeneration harvest on 84 acres, with commercial harvest volume estimated at 11.6 million board feet. Includes construction ...
    • Old Foley and North Bank gates project environmental assessment 

      McKenzie River Ranger District (Or.) (2005-05)
      Proposes gating roads 2638345 and 2600280, which would preclude motorized public access to 3.2 miles of road, at the request of Giustina Resources, who are concerned about human-caused fire.
    • Camp White Branch master plan environmental assessment 

      McKenzie River Ranger District (Or.) (2005-05)
      Proposes to implement a Master Plan that identifies a variety of improvements proposed to upgrade facilities and services for campers, comply with Americans with Disabilities Act and other special requirements, enhance the ...
    • Hartz young stand management decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2005-07-29)
      Announces decision to implement Alternative 4 of project EA, harvesting 706 acres, including 563 acres of thinning and 143 acres of regeneration harvest to be done later. This alternative will reduce the stand diversity ...
    • Two Bee landscape management project environmental assessment 

      McKenzie River Ranger District (Or.) (2006-10)
      Proposes to harvest timber on 825 acres, yielding approximately 10.8 million board feet (MMBF). Includes moderate partial cutting on 591 acres, moderate partial cutting with multi-story objectives on 121 acres, commercial ...
    • South Fork McKenzie River enhancement project environmental assessment 

      McKenzie River Ranger District (Or.) (2006-11)
      Responds to South Fork McKenzie Watershed Analysis findings of loss of early life habitat for bull trout and spring Chinook salmon by proposing to supplement existing in-stream large woody material for aquatic habitat ...
    • Two Bee landscape management project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2006-12-07)
      Announces decision to implement Alternative B of the project EA, harvesting timber on 825 acres, yielding approximately 10.8 million board feet (MMBF). Includes moderate partial cutting on 591 acres, moderate partial cutting ...
    • Trailbridge blowdown salvage project decision memo 

      McKenzie River Ranger District (Or.) (2007)
      Announces decision to implement project removing approximately 185 wind-thrown and root sprung trees from 17 acres located along the McKenzie River near a section of the McKenzie River National Recreation Trail above the ...
    • South Fork McKenzie River enhancement project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2007-01-11)
      Announces decision to implement Alternative A of the project EA, supplementing existing in-stream large woody material for aquatic habitat enhancement within an 8.5 mile reach of the South Fork McKenzie River and lower ...