Now showing items 1-20 of 28

    • Ball Park thin project decision notice and finding of no significant impact 

      Willamette National Forest (Agency : U.S.) (2008-09-05)
      Approves project implementing timber harvest on 915 acres for a gross estimate of 12.3 million board feet (MMBF) of Forest products. Natural fuels underburning will occur within two units on approximately 49 acres with ...
    • Ball Park thin project environmental assessment 

      Willamette National Forest (Agency : U.S.) (2008-07)
      Proposes to respond to the purpose and need by implementing timber harvest on 915 acres for a gross estimate of 12.3 million board feet (MMBF) of Forest products. Natural fuels underburning will occur within two units on ...
    • Research vegetation control environmental assessment 

      Willamette National Forest (Agency : U.S.) (2008-07)
      The McKenzie River Ranger District (MRRD) on the Willamette National Forest (WNF) proposes to treat competing vegetation occupying research plots on approximately 5416 m2 with glyphosate. This treatment may occur at a ...
    • Two Bee landscape management project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2006-12-07)
      Announces decision to implement Alternative B of the project EA, harvesting timber on 825 acres, yielding approximately 10.8 million board feet (MMBF). Includes moderate partial cutting on 591 acres, moderate partial cutting ...
    • Two Bee landscape management project environmental assessment 

      McKenzie River Ranger District (Or.) (2006-10)
      Proposes to harvest timber on 825 acres, yielding approximately 10.8 million board feet (MMBF). Includes moderate partial cutting on 591 acres, moderate partial cutting with multi-story objectives on 121 acres, commercial ...
    • South Fork McKenzie River enhancement project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2007-01-11)
      Announces decision to implement Alternative A of the project EA, supplementing existing in-stream large woody material for aquatic habitat enhancement within an 8.5 mile reach of the South Fork McKenzie River and lower ...
    • South Fork McKenzie River enhancement project environmental assessment 

      McKenzie River Ranger District (Or.) (2006-11)
      Responds to South Fork McKenzie Watershed Analysis findings of loss of early life habitat for bull trout and spring Chinook salmon by proposing to supplement existing in-stream large woody material for aquatic habitat ...
    • Upper McKenzie boat launch projects decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2007-06-14)
      Announces decision to implement Alternative 2 of the project EA, providing and maintaining opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and ...
    • Bridge thin project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2008-04-18)
      Announces decision to implement Alternative B of the project EA, to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The ...
    • Bridge thin project environmental assessment 

      McKenzie River Ranger District (Or.) (2008-03)
      Proposes to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The objectives would be to restore structural diversity in ...
    • Santiam Pass summer motorized recreation project environmental assessment 

      McKenzie River Ranger District (Or.) (2007-12)
      Proposes to develop and implement formal management of OHV use within the Santiam Wagon Road and Sand Mountain Special Interest Areas, the Big Lake Campground Complex, and the Hoodoo Ski Area. Includes designating a system ...
    • Trailbridge blowdown salvage project decision memo 

      McKenzie River Ranger District (Or.) (2007)
      Announces decision to implement project removing approximately 185 wind-thrown and root sprung trees from 17 acres located along the McKenzie River near a section of the McKenzie River National Recreation Trail above the ...
    • Upper McKenzie boat launch projects environmental assessment 

      McKenzie River Ranger District (Or.) (2007-02)
      Proposes to provide and maintain opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and reconstructing the existing launch at Paradise. Includes ...
    • Nineteen Road salvage timber sale project environmental assessment 

      McKenzie River Ranger District (Or.) (2002-07)
      Proposes to fall about 204 hazardous trees in 18 acres adjacent to Forest Service Road 19, and include 168 trees in a salvage timber sale that would yield an estimated 200 thousand board feet. The remaining 36 trees would ...
    • Spot salvage timber sale project environmental assessment 

      McKenzie River Ranger District (Or.) (2001-06)
      Proposes to fall 205 hazardous trees on 22 acres adjacent to state and federal highways, and include 171 trees in a salvage timber sale that would yield an estimated 100 thousand board feet. The remaining 34 trees, including ...
    • West Fork Horse Creek Bridge rehabilitation project environmental asessment 

      McKenzie River Ranger District (Or.) (2002-06)
      Proposes to rehabilitate the 52 year-old West Fork Horse Creek Bridge on Delta Road, including structural repairs throughout, and replacement of portions of the deteriorated glulam truss members. A temporary bridge would ...
    • Fish Lake interpretive facility environmental assessment 

      McKenzie River Ranger District (Or.) (2002-06-14)
      Proposes actions to develop an interpretive gateway facility to the historic Fish Lake Remount Depot, educating the public about the site's significance, making historic features more visible and accessible, and controlling ...
    • Old Foley and North Bank gates project environmental assessment 

      McKenzie River Ranger District (Or.) (2005-05)
      Proposes gating roads 2638345 and 2600280, which would preclude motorized public access to 3.2 miles of road, at the request of Giustina Resources, who are concerned about human-caused fire.
    • Camp White Branch master plan environmental assessment 

      McKenzie River Ranger District (Or.) (2005-05)
      Proposes to implement a Master Plan that identifies a variety of improvements proposed to upgrade facilities and services for campers, comply with Americans with Disabilities Act and other special requirements, enhance the ...
    • Hartz young stand management decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2005-07-29)
      Announces decision to implement Alternative 4 of project EA, harvesting 706 acres, including 563 acres of thinning and 143 acres of regeneration harvest to be done later. This alternative will reduce the stand diversity ...