Browsing NEPA Documents (BLM) by Subject "Public lands -- Oregon -- Lakeview Region"

Navigation

Display Options

Results

  • United States. Bureau of Land Management. Lakeview District (2008-08-27)
    Announces decision to implement project including 15 acres of commercial timber harvest, 24 acres of fuel reduction, 9 acres of vegetation treatments, 5 acres of aspen restoration, 5 acres of prescribed fire, and road ...
  • United States. Bureau of Land Management. Lakeview District (2008-07-10)
    Proposal includes 15 acres of commercial timber harvest, 24 acres of fuel reduction, 9 acres of vegetation treatments, 5 acres of aspen restoration, 5 acres of prescribed fire, and road improvement and renovation.
  • United States. Bureau of Land Management. Lakeview District (2008-08-27)
    Determines no environmental impact statement is needed for project including 15 acres of commercial timber harvest, 24 acres of fuel reduction, 9 acres of vegetation treatments, 5 acres of aspen restoration, 5 acres of ...
  • United States. Bureau of Land Management. Lakeview District (2008-07-15)
    Burlington-Northern Railway wants to replace the existing building on the communication site with a new prefabricated concrete structure. The new construction will be within the footprint of the Burlington Right-of-way ...
  • United States. Bureau of Land Management. Lakeview District (2008-09-15)
    Excludes from further NEPA documentation, project initiating approximately 130 acres of conifer thinning in riparian reserves in the Gerber Reservoir watershed that will be treated by hand cutting. Approximately 100 acres ...
  • United States. Bureau of Land Management. Lakeview District (2008-10-29)
    Announces decision to implement prescribed underburning on approximately 1,987 acres.
  • United States. Bureau of Land Management. Lakeview District (2008-07-29)
    Implements timber harvest on approximately 850 acres, post-harvest fuel reduction in the Matrix through prescribed fire, biomass, and thinning on about 1221 acres, provide riparian habitat restoration, and road resurfacing, ...
  • United States. Bureau of Land Management. Lakeview District (2008-07-29)
    Finds no adverse environmental impacts in project proposing commercial timber harvest on approximately 850 acres, post-harvest fuel reduction in the Matrix through prescribed fire, biomass, and thinning on about 1221 acres, ...
  • United States. Bureau of Land Management. Lakeview District (2007-06-19)
    Proposes to study the effects of reducing sagebrush height on pygmy rabbits by mowing specifically on 430 acres of sagebrush on 1500 total acres of rabbit habitat. After release of previous EA and FONSI, the research ...
  • United States. Bureau of Land Management. Lakeview District (2008-07-28)
    Finds no environmental impact statement is needed for project where Quicksilver has applied for a road use right-of-way to haul approximately 40 loads of Green Chips from a timber sale in California to Collins Products in ...
  • United States. Bureau of Land Management. Lakeview District (2008-10-22)
    The approved action will result in the implementation of the Buck 23 Timber Sale within the analysis area. Approximately 3.06 million board feet of timber will be harvested from approximately 378 acres of matrix lands and ...
  • United States. Bureau of Land Management. Lakeview District (2008-12-02)
    Excludes from further NEPA documentation, project using a chainsaw to fall the existing pole with an osprey platform on it just north of the Wood River Wetland pumping station. Transport the pole and platform with a tracked ...
  • United States. Bureau of Land Management. Lakeview District (2008-08-01)
    The purpose of the proposed action is to decommission or valve these wells such that they cease to continually discharge water. All five wells will be accessed by truck, ATV or boat. The top of the pipe (casing) will be ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics