Browsing NEPA Documents (BLM) by Author "United States. Bureau of Land Management. Eugene District"

Navigation

Display Options

Results

  • United States. Bureau of Land Management. Eugene District (1998-02)
    The Introduction chapter consists of a general description of the watershed and watershed analysis. The Characterization chapter summarizes the current conditions of important resources in the watershed such as soils, ...
  • United States. Bureau of Land Management. Eugene District (2007-05-30)
    Announces decision concluding that project conforms to the applicable land use plan and that the NEPA documentation fully covers the proposed action. Project proposes to thin commercially approximately 315 acres within the ...
  • United States. Bureau of Land Management. Eugene District (2007-06-25)
    Announces decision to implement project restoring the spatial and temporal connectivity of the aquatic system by improving fish passage at an existing road-stream crossing, enhancing aquatic and riparian habitat for resident ...
  • United States. Bureau of Land Management. Eugene District (2008-06-18)
    Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the proposed Camp Run Project (EA-OR090-07-06) was prepared by the Upper Willamette Resource Area, Eugene District of the Bureau of Land ...
  • United States. Bureau of Land Management. Eugene District (2005-10-04)
    Announces approval of project replacing the existing vehicle barriers in the Clay and Whittaker recreation sites with newer one meeting safety standards regarding height requirement and correct placement.
  • United States. Bureau of Land Management. Eugene District (2008-02-25)
    Announces decision implementing Alternative 2 of project EA to proceed with Drury Bunks timber sale as part of plan to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural ...
  • United States. Bureau of Land Management. Eugene District (2007-06-25)
    Announces decision implementing project on two sites. Includes repairing the site of the fill failure on road 16-3E-34, restoring the road surface, realigning the road approximately eight feet, installing needed crossdrains ...
  • United States. Bureau of Land Management. Eugene District (2007-06-25)
    Announces implementation of repairing one road and decommissioning another damaged by storms. Includes restoring road surface, realigning road, installing crossdrains and culverts, removing about twelve trees, and revegetating ...
  • United States. Bureau of Land Management. Eugene District (2008-08-08)
    An Environmental Assessment (EA) and Finding of No Significant Impacts (FONSI) for the proposed McKenzie Tribs Projects (EA-OR090-08-01) were prepared by the Upper Willamette Resource Area, Eugene District of the Bureau ...
  • United States. Bureau of Land Management. Eugene District (2006-05-03)
    Proposes to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and to treat stands to accelerate the ...
  • United States. Bureau of Land Management. Eugene District (2007-06-20)
    Announces decision to implement project providing a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and to ...
  • United States. Bureau of Land Management. Eugene District (2007-11-13)
    Proposes to provide a sustainable supply of timber while maintaining valuable structural components (snags and down wood) and to provide habitat for a variety of organisms associated with both late-successional and younger ...
  • United States. Bureau of Land Management. Eugene District (2007-12-10)
    Proposes to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and treat stands to accelerate the ...
  • United States. Bureau of Land Management. Eugene District (2007-10-25)
    Announces decision implementing Alternative 2 of the Mohawk East project EA, providing a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat ...
  • United States. Bureau of Land Management. Eugene District (2005-06-07)
    EA proposes thinning of GFMA and Riparian Reserve by commercial timber harvest, down wood creation in and near stream channels, road construction, renovation, and decommissioning. Decision notice selects Alternative E of ...
  • United States. Bureau of Land Management. Eugene District (2006-07-17)
    Announces decision to issue a right-of-way grant of approximately .15 acres to Lane County for the facilitation of replacing Row River Bridge.
  • United States. Bureau of Land Management. Eugene District (2007-08)
    Proposes salvage activities on about 40 acres, removing 650 thousand board feet (MBF) of blow down timber removed via a timber sale.
  • United States. Bureau of Land Management. Eugene District (2008-06-17)
    Proposes to implement a commercial thinning project and aquatic habitat restoration on approximately 760 acres in the Mohawk watershed, including timber harvest, instream habitat restoration, and road construction, ...
  • United States. Bureau of Land Management. Eugene District (2006-05-31)
    EA proposes to initiate a recreation management project to improve the Shotgun OHV trail system by (1) relocating, redesigning, or decommissioning portions of trails that are difficult to maintain or are causing excessive ...
  • United States. Bureau of Land Management. Eugene District (2006-03-22)
    Proposes to restore and enhance the spatial and temporal connectivity and the physical integrity of the aquatic ecosystem by eliminating human-caused barriers and enhancing habitat complexity within the Teeter Creek Drainage. ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics