Browsing Deschutes and Ochoco National Forests by Title

Navigation

Display Options

Results

  • Bend-Fort Rock Ranger District (Or.) (2000-07-10)
    Proposes to expand the Pit to access sand, gravel and aggregate material for use on the Forest for about the next 20 years. Includes using dozers with push blades, loaders and rock crushers, clearing trees from about 7 ...
  • Sisters Ranger District (Or.) (2006-12)
    Proposes to sell 68 acres of National Forest property to raise funds to build a new ranger station on the remaining 12 acres of the property, complete a small land exchange, and amend the Forest Plan allocation designations.
  • Sisters Ranger District (Or.) (2007-08)
    Proposes to reduce hazardous fuels and improve forest health on approximately 17,573 total acres. Includes thinning from below, ladder fuels reduction, application of prescribed fire, mastication, and mechanized piling and ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces decision to categorically exclude project constructing a 15 x 15 foot log shelter and a handicapped-accessible toilet at Six Mile. A vault toilet, which is handicapped-accessible, will be constructed onsite at Six Mile.
  • Deschutes National Forest (Agency : U.S.) (2008-03)
    Proposes to treat 5790 acres to lessen wildfire intensity, reduce resistance to control, and provide safer access for both firefighters and the public. Treatment units are strategically located on the landscape so that ...
  • Lookout Mountain Ranger District (Or.) (2008-05-02)
    Announces decision to implement noncommercial small tree thinning and slash disposal on approximately 114 acres within the wildland-urban interface in the Bridge Creek Watershed. Includes reducing small tree density and ...
  • Bend-Fort Rock Ranger District (Or.) (2000-11)
    Proposes to authorize a special use permit for construction, maintenance and operation of a permanent vehicle weigh and safety station on the northbound land of US Highway 97 south of Bend, between mileposts 145 and 148 ...
  • Bend-Fort Rock Ranger District (Or.) (2001-05)
    FEIS proposes to authorize special use permit for construction, maintenance and operation of a permanent vehicle weigh and safety station on the northbound land of US Highway 97 south of Bend, between mileposts 145 and 148 ...
  • Paulina Ranger District (Or.) (2008-06)
    Proposes to continue authorization of livestock grazing in the Heisler, Wind Creek, and Wolf Creek allotments using new grazing management standards and an adaptive management strategy. Use standards, known as Composite ...
  • Lookout Mountain Ranger District (Or.) (2007-04)
    Proposes to harvest commercially approximately 6172 acres of commercial harvest, 11,160 acres of precommercial thinning, and 196 acres of thinning in hardwood stands. Includes some 15,464 acres of prescribed fire, 3015 ...
  • Lookout Mountain Ranger District (Or.) (2007-07)
    FEIS proposes to harvest commercially on 6172 acres, precommercial thinning on 11,160 acres, and 196 acres of thinning in hardwood stands. Includes some 15,464 acres of prescribed fire, 3015 acres of grapple piling, 718 ...
  • Bend-Fort Rock Ranger District (Or.) (2004-12-28)
    Announces decision to implement Alternative 4 of the project EA, to relocate the existing state inmate crew camp at Deschutes Bridge gravel pit to Deschutes Bridge Campground rather than the Ogden Group Camp, which would ...
  • Bend-Fort Rock Ranger District (Or.) (2007-02-02)
    Proposes to relocate the existing state inmate crew camp at Deschutes Bridge gravel pit to Ogden Group Camp. Includes supplying improved electricity to the camp where none currently exists and new water lines to meet staff ...
  • Paulina Ranger District (Or.) (2007-05-29)
    Announces decision to implement the project, commercially harvesting 34 acres of ponderosa pine and non-commercially thin 55 acres of overly dense, second-growth ponderosa pine stands that are imminently susceptible to ...
  • Bend-Fort Rock Ranger District (Or.) (2006-09)
    Announces decision to categorically exclude from EA or EIS documentation the proposed action to construct an animal exclusion fence around the perimeter of the seed orchard to protect orchard trees from big game browse.
  • Bend-Fort Rock Ranger District (Or.) (2008-01-22)
    Announces decision to implement Alternative 2 of project EA, reducing hazardous fuels in the wildland-urban interface adjacent to Sunriver to reduce wildland fire risk to communities and forest values and to provide obvious, ...
  • Bend-Fort Rock Ranger District (Or.) (2007-12)
    Proposes to reduce hazardous fuels in the wildland-urban interface adjacent to Sunriver to reduce wildland fire risk to communities and forest values, and to provide obvious, safe access and evacuation routes. Includes ...
  • Bend-Fort Rock Ranger District (Or.) (2007-02-07)
    Announces decision to implement Alternative 2 of project EA, continuing a special use permit issued to Four Rivers Vector Control District for treatment of mosquitoes with the bacterial insecticide Bti on federally-owned ...
  • Bend-Fort Rock Ranger District (Or.) (2007)
    Proposes to continue a special use permit issued to Four Rivers Vector Control District for treatment of mosquitoes with the bacterial insecticide Bti on federally-owned land near Sunriver, modified to expand the treatment ...
  • Sisters Ranger District (Or.) (2001-07-26)
    Announces decision to implement Alternative B with minor modifications of the project EA, which addresses the types and level of structures, roads, and trails to be developed at the Resort, and addresses restoration, ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics