Browsing Deschutes and Ochoco National Forests by Title

Navigation

Display Options

Results

  • Crescent Ranger District (Or.) (2004-04)
    Proposes to reduce fuels by treating approximately 3900 acres to achieve sustainable vegetative conditions and lower the risk of stand replacement wildfire. Includes tree and small tree thinning, hand and machine piling ...
  • Crescent Ranger District (Or.) (2003-05)
    Provides analysis at the project level, and is limited in scope to the Crescent Lake WUI area, some 12, 030 acres. Includes setting up the analysis, describing the situation, identifying the issues, assessing benefits, ...
  • Crooked River National Grassland (Or.) (2006)
    Announces implementation of project to reduce fuels and resultant wildfire risk on 200 acres adjacent to the ranch. Designated a wildlife-urban area, the project includes cutting juniper trees less than 12" (dbh) with ...
  • Bend-Fort Rock Ranger District (Or.) (2006-07-27)
    Announces decision to improve forested stands conditions and reduce fire hazard within the wildland-urban interface. Includes treating surface, ladder, and canopy fuels through the use of a combination of mechanical surface ...
  • Bend-Fort Rock Ranger District (Or.) (2006-03-08)
    Announces decision to improve forested stand conditions and reduce fire hazard within the wildland-urban interface. Includes treating surface, ladder, and canopy fuels through the use of a combination of mechanical shrub ...
  • Deschutes National Forest (Agency : U.S.); Fremont National Forest (Agency : U.S.); Winema National Forest (Agency : U.S.) (1998)
    Proposes joint land exchange involving approximately 32,936 acres of National Forest Service (NFS) lands for about 38,745 acres of land owned by Crown Pacific Limited Partnership. Involves lands within and in the vicinity ...
  • Deschutes National Forest (Agency : U.S.); Fremont National Forest (Agency : U.S.); Winema National Forest (Agency : U.S.) (1998-02-27)
    Announces decision to implement proposed action alternative of project FEIS, effecting a land exchange involving approximately 32,936 acres of National Forest Service (NFS) lands for about 38,745 acres of land owned by ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces decision to implement Alternative 3 of project EA, removing, reconfiguring, and replacing the boat ramp and docking area, dredging to improve access to open water from the boat ramp, and redesigning the parking ...
  • Bend-Fort Rock Ranger District (Or.) (2003-02)
    Proposes to remove, reconfigure, and replace the boat ramp and docking area, dredge to improve access to open water from the boat ramp, and redesign the parking areas to incorporate increased and designated parking that ...
  • Bend-Fort Rock Ranger District (Or.) (2003-09-12)
    Announces decision to implement Alternative 3 of project EA, constructing a parking area for day and extended-use resort visitors, as well as a laundry for visitors and additional housing for employees.
  • Bend-Fort Rock Ranger District (Or.) (2003-07)
    Proposes to construct a parking area for day and extended-use resort visitors, as well as a laundry for visitors and additional housing for employees.
  • Bend-Fort Rock Ranger District (Or.) (2006-09-18)
    Announces decision to issue a special use permit to allow Davenport Energy, LLC to conduct geophysical exploration activities involving exploiting geothermal energy as a commercial source. Includes conducting magneto-telluric ...
  • Crescent Ranger District (Or.) (2003-10)
    Provides analysis at the project level, and is limited in scope to the Davis Fire area and the Closure area, some 21,000 acres. Includes description of the situation; assessment of the benefits, problems, and risks; ...
  • Crescent Ranger District (Or.) (2004-08)
    Proposes to implement salvage harvest and subsequent fuel treatments on 6355 acres on the Davis Fire area, 10 miles west of La Pine. Includes ground-based logging methods (3785 acres), aerial harvest systems on steeper ...
  • Crescent Ranger District (Or.) (2004-09-14)
    Announces decision to implement Alternative B of project FEIS, implementing salvage harvest and subsequent fuels treatments on 6355 acres on the Davis Fire area, 10 miles west of La Pine. Includes ground-based logging ...
  • Paulina Ranger District (Or.) (2004-06)
    Proposes to improve watershed health by restoring and managing highly impacted streams, restoring streams to a more desired pattern, profile, and dimension, and improving aquatic habitats to support redband trout populations. ...
  • Paulina Ranger District (Or.) (2004-01)
    Proposes to improve improve vegetative diversity, reduce the current fire hazard, improve the amount of shade producing vegetation and large woody material for streams, and reduce sedimentation from roads. Includes improvement ...
  • Paulina Ranger District (Or.) (2004-01)
    Announces decision to implement Alternative C of project Supplementary EIS, to improve vegetative diversity, reduce the current fire hazard, improve the amount of shade producing vegetation and large woody material for ...
  • Bend-Fort Rock Ranger District (Or.) (2003-07)
    Announces decision to implement Alternative 2 of project EA, improving access and habitat available to fish, and to restore the natural sediment regime to the stream segment by removing the dam and the accumulated sand and ...
  • Bend-Fort Rock Ranger District (Or.) (2003-01)
    Proposes to improve access and habitat available to fish, and to restore the natural sediment regime to the stream segment by removing the dam and the accumulated sand and salt, grading the stream bottom to the same slope ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics