Now showing items 72-91 of 232

    • Davenport Energy, LLC geophysical exploration project decision memo 

      Bend-Fort Rock Ranger District (Or.) (2006-09-18)
      Announces decision to issue a special use permit to allow Davenport Energy, LLC to conduct geophysical exploration activities involving exploiting geothermal energy as a commercial source. Includes conducting magneto-telluric ...
    • Davis Fire area roads analysis report 

      Crescent Ranger District (Or.) (2003-10)
      Provides analysis at the project level, and is limited in scope to the Davis Fire area and the Closure area, some 21,000 acres. Includes description of the situation; assessment of the benefits, problems, and risks; ...
    • Davis Fire recovery project final environmental impact statement 

      Crescent Ranger District (Or.) (2004-08)
      Proposes to implement salvage harvest and subsequent fuel treatments on 6355 acres on the Davis Fire area, 10 miles west of La Pine. Includes ground-based logging methods (3785 acres), aerial harvest systems on steeper ...
    • Davis Fire recovery project record of decision 

      Crescent Ranger District (Or.) (2004-09-14)
      Announces decision to implement Alternative B of project FEIS, implementing salvage harvest and subsequent fuels treatments on 6355 acres on the Davis Fire area, 10 miles west of La Pine. Includes ground-based logging ...
    • Deep Creek watershed restoration environmental assessment 

      Paulina Ranger District (Or.) (2004-06)
      Proposes to improve watershed health by restoring and managing highly impacted streams, restoring streams to a more desired pattern, profile, and dimension, and improving aquatic habitats to support redband trout populations. ...
    • Deep vegetation management project final supplementary environmental impact statement summary 

      Paulina Ranger District (Or.) (2004-01)
      Proposes to improve improve vegetative diversity, reduce the current fire hazard, improve the amount of shade producing vegetation and large woody material for streams, and reduce sedimentation from roads. Includes improvement ...
    • Deep vegetation management project record of decision 

      Paulina Ranger District (Or.) (2004-01)
      Announces decision to implement Alternative C of project Supplementary EIS, to improve vegetative diversity, reduce the current fire hazard, improve the amount of shade producing vegetation and large woody material for ...
    • Deer Creek small dam removal project decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.) (2003-07)
      Announces decision to implement Alternative 2 of project EA, improving access and habitat available to fish, and to restore the natural sediment regime to the stream segment by removing the dam and the accumulated sand and ...
    • Deer Creek small dam removal project environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2003-01)
      Proposes to improve access and habitat available to fish, and to restore the natural sediment regime to the stream segment by removing the dam and the accumulated sand and salt, grading the stream bottom to the same slope ...
    • Deschutes County lands fuels reduction project decision memo 

      Bend-Fort Rock Ranger District (Or.) (2003-08)
      Announces decision to proceed with fuels reduction project, treating 142 subdivision lots on approximately 100 acres of Deschutes County owned land. Includes reducing stand density and fuel loading through the use of ...
    • Deschutes County Road Department sand shed project decision memo 

      Bend-Fort Rock Ranger District (Or.) (2007-08-29)
      Announces decision to issue a special use permit to allow the Deschutes County Road Department to construct, operate and maintain a road sanding material storage site on National Forest System lands. After the completion ...
    • Deschutes County Road Department sand shed project draft decision memo 

      Bend-Fort Rock Ranger District (Or.) (2007-05)
      Announces decision to issue a special use permit to allow the Deschutes County Road Department to construct, operate and maintain a road sanding material storage site on National Forest System lands. After the completion ...
    • Deschutes River gravel restoration project decision memo 

      Bend-Fort Rock Ranger District (Or.) (2006-02)
      Announces decision to authorize the placement of approximately 110 cubic yards of spawning gravel into the Deschutes River to enhance redband and brown trout habitat. The project, in partnership with the Oregon Department ...
    • Devil's Garden planning area Hole-in-the-ground subunit decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.) (2001-09-25)
      Announces decision to implement Alternative 3 of project EA, deferring the decision to close the vacant Gebhardt Flat Range Allotment, and treating 4520 acres with vegetation and/or fuel treatments. Includes prescribed ...
    • Dilman notice of decision 

      Bend-Fort Rock Ranger District (Or.) (2001-12-26)
      Announces decision to implement Alternative 3 of project EA, authorizing vegetation management activities on approximately 5283 acres. Includes closing 63 miles of road, resurfacing 12 miles of roads, designating 32 dispersed ...
    • East Maury fuels and vegetation management project draft environmental impact statement 

      Lookout Mountain Ranger District (Or.) (2008-04)
      Proposes to use commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains for the treatment of fuels and vegetation management. Includes ...
    • East Maury fuels and vegetation management project final environmental impact statement 

      Lookout Mountain Ranger District (Or.) (2008-07)
      Proposes to use commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains for the treatment of fuels and vegetation management. Includes ...
    • East Maury fuels and vegetation management project record of decision 

      Lookout Mountain Ranger District (Or.) (2008-07-08)
      Announces decision implementing modified version of Alternative 2 of FEIS, using commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains ...
    • East Tumbull environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2006-07)
      Proposes to reduce hazardous fuels in the wildland-urban interface around and adjacent to Sunriver, the Inn of the 7th Mountain, and the Highland subdivision area of Bend, and to provide obvious, safe access and evacuation ...
    • East Tumbull hazardous fuels reduction project decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.) (2006-07)
      Proposes to reduce hazardous fuels in the wildfire-urban interface around and adjacent to Sunriver, the Inn of the 7th Mountain, and the Highlands subdivision area of Bend, and to provide obvious, safe access and evacuation ...