Now showing items 173-192 of 232

    • Rager wildland urban interface (WUI) fuels project decision memo 

      Paulina Ranger District (Or.) (2007-09-06)
      Announces implementation of underburning of 2770 acres, non-commercial thinning of 1000 acres, and machine piling of 123 acres to reduce the threat of uncharacteristically intense wildfire.
    • RCC, Atlantic Wampus Butte communications site building and tower decision memo 

      Bend-Fort Rock Ranger District (Or.) (2006-09-27)
      Announces decision to issue a communication lease to RCC, Atlantic, Inc. to construct a building at the Wampus Butte communications site, to be constructed, operated and maintained as a cellular base station facility to ...
    • Road 18 cave project environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2001-06)
      Proposes to preserve and protect cave resources of the eight caves located within the Arnold lava tube system and Skeleton Cave by making adjustments designed to reduce or eliminate impacts to caves and cave resources from ...
    • Road 18 caves project decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.) (2001-08-30)
      Proposes to preserve and protect cave resources of the eight caves located within the Arnold lava tube system and Skeleton Cave by making adjustments designed to reduce or eliminate impacts to caves and cave resources from ...
    • Roads analysis report for Eyerly project area 

      Sisters Ranger District (Or.) (2003-04)
      Analyzes road conditions on the 66.8 square miles of land accessed by 161.3 miles of road. Six-part process includes: setting up the analysis, describing the situation, identifying issues, assessing benefits, problems and ...
    • Rock Springs trails special use permit decision memo 

      Bend-Fort Rock Ranger District (Or.) (2003-03)
      Announces decision to categorically exclude authorization of a special 5-year use permit to Rock Springs Guest Ranch for the non-exclusive use of approximately 25.3 miles of trail and road. Includes constructing .3 miles ...
    • Round Lake Christian Camp decision memo 

      Sisters Ranger District (Or.) (2006-08-10)
      Announces decision to approve the master plan for the reconstruction of Round Lake Christian Camp following the destruction of the August 2003 B&B Complex Fire. Includes rebuilding cabins, shower, bath facilities and ...
    • Ryan Ranch Meadow/Aspen/Willow enhancement project final decision memo 

      Bend-Fort Rock Ranger District (Or.) (2008-03-25)
      Announces decision to improve habitat conditions on approximately 95 acres of existing upland meadow, aspen and willow habitats in the Ryan Ranch Meadow area west of the Deschutes River by broadcast burning approximately ...
    • Ryan Ranch Meadow/Aspen/Willow enhancement project preliminary decision memo 

      Bend-Fort Rock Ranger District (Or.) (2007-10-25)
      Announces decision to improve habitat conditions on approximately 95 acres of existing upland meadow, aspen and willow habitats in the Ryan Ranch meadow area west of the Deschutes River by broadcast burning approximately ...
    • Sanitation environmental assessment decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.); Sisters Ranger District (Or.) (2002-01-31)
      Announces decision to implement Alternative B of project EA, with mitigation measures, to remove 13 existing toilets at 11 different recreational sites, install 14 toilets at the same 11 recreational sites, install 4 new ...
    • Section 23 easement and road adustment environmental assessment 

      Sisters Ranger District (Or.) (2000-10-10)
      Proposes to evaluate request by David Hermann of Pumpkin Pine LLC to abandon, relocate and consolidate some Forest Service road and rail easements across his private lands and build short sections of new road and trail to ...
    • Seven Buttes return vegetation management project environmental assessment 

      Crescent Ranger District (Or.) (2001-07)
      Proposes to address opportunities for restoring ecosystems identified during the Odell Watershed Analysis (1999), Big Marsh Watershed Analysis (1997), and to implement the management strategy defined for the Davis Late ...
    • Seven Buttes return vegetation managment project part A decision notice and finding of no significant impact 

      Crescent Ranger District (Or.) (2001-07-23)
      Announces decision to restore ecosystems identified during the Odell Watershed Analysis (1999), Big Marsh Watershed Analysis (1997), and to implement the management strategy defined for the Davis Late Successional Reserve ...
    • Seventh Mountain rock pit expansion environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2000-07-10)
      Proposes to expand the Pit to access sand, gravel and aggregate material for use on the Forest for about the next 20 years. Includes using dozers with push blades, loaders and rock crushers, clearing trees from about 7 ...
    • Sisters admin site land conveyance environmental assessment 

      Sisters Ranger District (Or.) (2006-12)
      Proposes to sell 68 acres of National Forest property to raise funds to build a new ranger station on the remaining 12 acres of the property, complete a small land exchange, and amend the Forest Plan allocation designations.
    • Sisters area fuels reduction (SAFR) project environmental assessment 

      Sisters Ranger District (Or.) (2007-08)
      Proposes to reduce hazardous fuels and improve forest health on approximately 17,573 total acres. Includes thinning from below, ladder fuels reduction, application of prescribed fire, mastication, and mechanized piling and ...
    • Six Mile Snopark decision memo 

      Bend-Fort Rock Ranger District (Or.) (2003-05)
      Announces decision to categorically exclude project constructing a 15 x 15 foot log shelter and a handicapped-accessible toilet at Six Mile. A vault toilet, which is handicapped-accessible, will be constructed onsite at Six Mile.
    • Snow fuels reduction project environmental assessment 

      Deschutes National Forest (Agency : U.S.) (2008-03)
      Proposes to treat 5790 acres to lessen wildfire intensity, reduce resistance to control, and provide safer access for both firefighters and the public. Treatment units are strategically located on the landscape so that ...
    • Snowshoe project decision memo 

      Lookout Mountain Ranger District (Or.) (2008-05-02)
      Announces decision to implement noncommercial small tree thinning and slash disposal on approximately 114 acres within the wildland-urban interface in the Bridge Creek Watershed. Includes reducing small tree density and ...
    • South Bend weigh and safety station draft environmental impact statement summary 

      Bend-Fort Rock Ranger District (Or.) (2000-11)
      Proposes to authorize a special use permit for construction, maintenance and operation of a permanent vehicle weigh and safety station on the northbound land of US Highway 97 south of Bend, between mileposts 145 and 148 ...