Browsing Bend - Fort Rock Ranger District by Title
Now showing items 31-50 of 111
-
Davenport Energy, LLC geophysical exploration project decision memo
(2006-09-18)Announces decision to issue a special use permit to allow Davenport Energy, LLC to conduct geophysical exploration activities involving exploiting geothermal energy as a commercial source. Includes conducting magneto-telluric ... -
Deer Creek small dam removal project decision notice and finding of no significant impact
(2003-07)Announces decision to implement Alternative 2 of project EA, improving access and habitat available to fish, and to restore the natural sediment regime to the stream segment by removing the dam and the accumulated sand and ... -
Deer Creek small dam removal project environmental assessment
(2003-01)Proposes to improve access and habitat available to fish, and to restore the natural sediment regime to the stream segment by removing the dam and the accumulated sand and salt, grading the stream bottom to the same slope ... -
Deschutes County lands fuels reduction project decision memo
(2003-08)Announces decision to proceed with fuels reduction project, treating 142 subdivision lots on approximately 100 acres of Deschutes County owned land. Includes reducing stand density and fuel loading through the use of ... -
Deschutes County Road Department sand shed project decision memo
(2007-08-29)Announces decision to issue a special use permit to allow the Deschutes County Road Department to construct, operate and maintain a road sanding material storage site on National Forest System lands. After the completion ... -
Deschutes County Road Department sand shed project draft decision memo
(2007-05)Announces decision to issue a special use permit to allow the Deschutes County Road Department to construct, operate and maintain a road sanding material storage site on National Forest System lands. After the completion ... -
Deschutes River gravel restoration project decision memo
(2006-02)Announces decision to authorize the placement of approximately 110 cubic yards of spawning gravel into the Deschutes River to enhance redband and brown trout habitat. The project, in partnership with the Oregon Department ... -
Devil's Garden planning area Hole-in-the-ground subunit decision notice and finding of no significant impact
(2001-09-25)Announces decision to implement Alternative 3 of project EA, deferring the decision to close the vacant Gebhardt Flat Range Allotment, and treating 4520 acres with vegetation and/or fuel treatments. Includes prescribed ... -
Dilman notice of decision
(2001-12-26)Announces decision to implement Alternative 3 of project EA, authorizing vegetation management activities on approximately 5283 acres. Includes closing 63 miles of road, resurfacing 12 miles of roads, designating 32 dispersed ... -
East Tumbull environmental assessment
(2006-07)Proposes to reduce hazardous fuels in the wildland-urban interface around and adjacent to Sunriver, the Inn of the 7th Mountain, and the Highland subdivision area of Bend, and to provide obvious, safe access and evacuation ... -
East Tumbull hazardous fuels reduction project decision notice and finding of no significant impact
(2006-07)Proposes to reduce hazardous fuels in the wildfire-urban interface around and adjacent to Sunriver, the Inn of the 7th Mountain, and the Highlands subdivision area of Bend, and to provide obvious, safe access and evacuation ... -
Empire Stone decorative stone project decision memo
(2006-02-13)Announces decision to issue a special use permit for prospecting to Empire Stone Company to explore for decorative stone material. Includes digging up to 10 holes approximately 5' x 5' in size in preselected locations to ... -
Empire Stone decorative stone project draft decision memo
(2005-12)Announces decision to be made will be to issue a special use permit for prospecting to Empire Stone Company to explore for decorative stone material. Includes digging up to 10 holes approximately 5'x 5' in size in preselected ... -
Environmental assessment for the collocation of the Bend-Fort Rock Ranger District office, forest headquarters office, and work center construction and reorganization
(2007)Proposes to construct a new office and associated structures and infrastructure at the Bend Pine Work Center (BPWC), thus locating all Forest Service administrative functions near the city of Bend at one site. Costs and ... -
Environmental assessment for the collocation of the Bend-Fort Rock Ranger District office, forest headquarters office, and work center construction and reorganization decision notice and finding of no significant impact
(2008-01-17)Announces decision to implement Alternative 2 of project EA, constructing a new office and associated structures and infrastructure at the Bend Pine Work Center (BPWC), thus locating all Forest Service administrative ... -
Fall project environmental assessment
(2004-05-18)Announces decision to implement Alternative 3 of the project EA with minor modifications, harvesting some commercial fiber on an estimated 3103 acres, including about 13,640 hundred cubic feet of firmwood fiber and cords. ... -
Flat Top planning area hazardous fuels reduction project decision memo
(2006-03)Proposes to implement the use of prescribed burning and mechanical shrub treatment (MST, mowing) to reduce surface fuels and shrub continuity, primarily beneath large open grown, ponderosa pine tree canopies. -
Fry thinning project decision memo
(2008-01-22)Announces decision to proceed with project thinning and using prescribed fire to reduce crown fire susceptibility and fire behavior, improve public safety and facilities protection, help restore a dry mixed conifer forest ... -
Gull Point boat ramps improvement project decision notice and finding of no significant impact
(2008-02-28)Announces decision to authorize implementation of Alternative 2 of project EA, bettering recreational infrastructure, public safety and satisfaction by improving the boat ramps at Gull Point and North Wickiup. Includes ... -
Gull Point boat ramps improvement project environmental assessment
(2007-11)Proposes to better recreation infrastructure, public safety and satisfaction by improving the boat ramps at Gull Point and North Wickiup. Includes replacing existing ramp to provide safe boat launching facilities for boaters ...