Browsing Sisters Ranger District by Title

Navigation

Display Options

Results

  • Sisters Ranger District (Or.) (2003-04)
    Analyzes road conditions on the 66.8 square miles of land accessed by 161.3 miles of road. Six-part process includes: setting up the analysis, describing the situation, identifying issues, assessing benefits, problems and ...
  • Sisters Ranger District (Or.) (2006-08-10)
    Announces decision to approve the master plan for the reconstruction of Round Lake Christian Camp following the destruction of the August 2003 B&B Complex Fire. Includes rebuilding cabins, shower, bath facilities and ...
  • Bend-Fort Rock Ranger District (Or.); Sisters Ranger District (Or.) (2002-01-31)
    Announces decision to implement Alternative B of project EA, with mitigation measures, to remove 13 existing toilets at 11 different recreational sites, install 14 toilets at the same 11 recreational sites, install 4 new ...
  • Sisters Ranger District (Or.) (2000-10-10)
    Proposes to evaluate request by David Hermann of Pumpkin Pine LLC to abandon, relocate and consolidate some Forest Service road and rail easements across his private lands and build short sections of new road and trail to ...
  • Sisters Ranger District (Or.) (2006-12)
    Proposes to sell 68 acres of National Forest property to raise funds to build a new ranger station on the remaining 12 acres of the property, complete a small land exchange, and amend the Forest Plan allocation designations.
  • Sisters Ranger District (Or.) (2007-08)
    Proposes to reduce hazardous fuels and improve forest health on approximately 17,573 total acres. Includes thinning from below, ladder fuels reduction, application of prescribed fire, mastication, and mechanized piling and ...
  • Sisters Ranger District (Or.) (2001-07-26)
    Announces decision to implement Alternative B with minor modifications of the project EA, which addresses the types and level of structures, roads, and trails to be developed at the Resort, and addresses restoration, ...
  • Sisters Ranger District (Or.) (2002-05-15)
    Announces decision to implement Alternative 2 of project EA, restoring the natural hydrologic functions of the swamp by re-establishing historic, shallow stream channels through the interior. Includes digging channels by ...
  • Sisters Ranger District (Or.) (2002-02)
    Proposes to restore the natural hydrologic functions of the swamp by re-establishing historic, shallow stream channels through the interior. Includes digging channels by mechanical means, replacing the culvert under Forest ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics